Date |
Text |
2019-09-13 07:12:15 | 09/13/2019 1ST GAS/LP/TANK REVIEW **DENIED** WITH |
| COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. UNDER RESIDENTIAL REMODEL PERMIT 18090030 WHEN IT |
| WENT UNDER REVIEW A GAS REVIEW WAS NOT DONE AND A FULL |
| REVIEW WILL BE REQUIRED, AND IT WAS ALSO NOTED THAT |
| NEEDED A SEPARATE PERMIT WAS REQUIRED. THE REVIEW WAS |
| NOT ADDRESSED AND AT FINAL PLUMBING INSPECTION IT WAS |
| ALSO NOTED THAT A PERMIT AND INSPECTION WAS REQUIRED |
| AND A PERMIT WAS PULLED WHICH HAD NO REVIEW AS GENERAL |
| CONTRACTOR TOLD BUILDING DEPARTMENT THAT IT WAS NOT |
| NEEDED, AS FOR FURTHER ACCESSING THE PLAN A FULL REVIEW |
| IS REQUIRED WHICH WILL BE DONE UNDER THIS REVIEW PER |
| WPB AMENDMENTS TO FBC SEC. 107.2.1 |
| 2. GAS RISER DIAGRAM MISSING INFORMATION PER THE WPB |
| AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL |
| GAS. |
| 3. TYPE OF GAS (LP OR NATURAL). WPB AMENDMENTS TO THE |
| FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| 4. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2017 FBC RES. SEC. G2413.2. |
| 5. PLEASE SHOW SHUTOFF VALVES, UNIONS, DRIP LEGS, BTU |
| AND REGULATORS ON ISOMETRIC PER THE 2017 FBC RES. SEC. |
| G2420.4. |
| 6. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1' OF |
| EITHER SIDE PER THE 2017 FBC FG SEC 410.2. |
| 7. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2017 FBC |
| RES. SEC. G2413.4.1. |
| 8. INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS |
| THE ONLY GAS APPLIANCE IN THIS SYSTEM? IF NOT, SUBMIT A |
| COMPLETE GAS RISER SHOWING ALL PIPE SIZES, TYPE OF |
| PIPE, THE DEVELOPED LENGTH TO THE FURTHEST GAS OUTLET, |
| THE BTU LOAD OF EACH APPLIANCE, THE PSI OF THE SYSTEM, |
| THE TYPE OF GAS AND THE TOTAL BTU LOAD ON THE SYSTEM. |
| THESE REQUIREMENTS ALSO APPLY TO A NEW GAS SYSTEM. WPB |
| AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL |
| GAS |
| 9. THE PLANS INDICATE THAT THERE IS GENERATOR, IF IT |
| WAS INSTALLED OR FUTURE PLEASE INDICATE. THE BTU LOAD |
| OF ALL GAS SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD |
| ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY |
| SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST BE |
| REDONE TO ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS |
| PIPING RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| EXISTING APPLIANCES PER THE 2017 FBC RES. SECS. |
| G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| 10. SUBMIT TWO COPIES OF THE FOR THE INSTALLATION |
| CLEARANCES FROM THE TANKLESS INSTALLATION MANUAL. THE |
| MANUAL REQUIRES A CLEARANCE OF EITHER 4 FEET OR 12 |
| INCHES FROM ANY OPERABLE WINDOWS OR DOORS. SHOW THE |
| LOCATION OF ALL OPERABLE WINDOWS AND DOORS ON THE PLAN |
| AND THE DISTANCE OF THE TANKLESS WATER HEATER FROM |
| EACH. WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| 11. IF THIS TANKLESS UNIT CALL FOR 10.5" WATER COLUMN |
| AND THE SERVICE METER DISCHARGES IS A 12" WATER COLUMN |
| REQUIRING A REGULATOR FOR THIS UNIT AS PER |
| MANUFACTURER'S SPECIFICATION. SUBMIT MANUFACTURER'S |
| SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE |
| APPROVED FOR OUTDOOR INSTALLATION PER THE 2017 FBC RES. |
| SEC. G2421.1. |
| 12. SUBMIT COMPLETE MANUFACTURER'S SPECIFICATIONS AND |
| INSTALLATION MANUALS FOR ALL TANKLESS GAS |
| APPLIANCES/EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| INSPECTION PER THE 2017 FBC RES. SEC. G2413.2 AND |
| G2404.3. |
| |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| |
| LUIS A. CRESPO |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 1:00 PM TO 4:00 PM |
| [email protected] |
| 561-805-6720 |
| |