Plan Review Notes
Plan Review Notes For Permit 19081434
Permit Number 19081434
Review Stop P
Sequence Number 1
Notes
Date Text
2019-09-05 16:27:3509/05/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. A FULL ADDRESS OF THE PROJECT OR RESIDENCE MUST BE
 ON PLANS ON PAGE 2,3,4 AND 5PER THE WPB AMENDMENTS TO
 THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 2. BACKFLOW PREVENTER REQUIRED PER THE CITY OF WEST
 PALM BEACH ORD #2853-95. A PERMIT REQUIRED BY A
 LICENSED CONTRACTOR AND MUST BE CERTIFIED BY UTILITIES
 PRIOR TO FINAL INSPECTION. A DUAL CHECK VALVE MAY BE
 USED IF NO POOL FILL IS INSTALLED AT THE METER AND
 INSTALLED BY UTILITIES WHICH DO NOT REQUIRE A PERMIT SO
 PLEASE CONTACT CITY OF WPB UTILITIES AT 561-822-2240
 FOR FURTHER DIRECTIONS.
  
 3. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW THAT ARE LEGIBLE, EXPAND CHART ON A
 DIFFERENT PAGE AND OR ENLARGE. THE CHAT ON PAGE THREE
 FOR SYSTEM CURVE NUMBER DO NOT COINCIDE WHERE MARK, WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 4. THE DYNAMIC HEAD CALCULATIONS FOR THE MAXIMUM SYSTEM
 FLOW DOES NOT SHOW ALL FRICTION LOSS THROUGH ALL
 COMPONENTS, CHLORINATORS, HEATER, ETC., ON THE HAYWARD
 CALCULATOR CHART. ASSUME THE TOTAL FRICTION LOSS WOULD
 INCLUDE THE PIPE, FITTINGS (90-DEGREE FITTINGS, 45'S,
 TEES) AND ALSO VALVES AND FILTER. WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 5. IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS
 SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS
 IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE
 TDH CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9,
 4.4.9.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM