2019-08-28 18:05:20 | 08/28/2018 1ST GAS REVIEW **DENIED** WITH COMMENTS. |
| |
| NOTE: A FULL AND COMPREHENSIVE PLAN REVIEW COULD NOT BE |
| ACCOMPLISHED AT THIS TIME DUE TO THE QUALITY OF THE |
| SUBMITTED PLANS. ADDITIONAL COMMENTS MAY BE GENERATED |
| ON THE RESUBMITTAL REVIEW. |
| |
| 1. A REGULATOR IS REQUIRED TO BRING THE SYSTEM DOWN TO |
| 10.0 WC. PLEASE SUBMIT MANUFACTURER?S SPECIFICATIONS |
| FOR THE PRESSURE REGULATORS. REGULATORS INSTALLED ON |
| THE EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR |
| OUTDOOR INSTALLATION PER THE 2017 FBC RES. SEC. G2421. |
| |
| 2. GAS RISER DIAGRAM REQUIRED, SUBMIT AN ISOMETRIC |
| DRAWING THAT CLEARLY SHOWS, UNIONS, SHUTOFF VALVES ON |
| SYSTEM, SEDIMENT TRAP AND REGULATOR PER THE 2017 FBC |
| RES. SECS. G2413.4.1, G2413.4.2. |
| |
| 3. THE ADDRESS OF THE PROJECT OR RESIDENCE MUST BE ON |
| PLAN. WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION |
| ON CONSTRUCTION DOCUMENTS. |
| |
| 4. TYPE OF GAS LABELED ON PLANS AND METER PER THE WPB |
| AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| 5. ONLY PAGE ONE OF THE MANUAL WAS SUBMITTED ON |
| MANUFACTURER?S SPECIFICATION SHEETS/INSTALLATION MANUAL |
| FOR POOL HEATER EQUIPMENT WE WILL NEED TO VERIFY |
| COMPLIANCE WITH 2017 FBC FG RES. SEC. G2408.1. THE POOL |
| HEATER SHALL HAVE A MINIMUM THERMAL EFFICIENCY OF 82% |
| PER THE 2017 FBC-ENERGY SEC. R403.10.4. |
| |
| 6. SUBMIT MANUFACTURER?S SPECIFICATION |
| SHEETS/INSTALLATION MANUAL FOR POOL HEATER EQUIPMENT TO |
| VERIFY COMPLIANCE WITH 2017 FBC FG RES. SEC. G2408.1. |
| THE POOL HEATER SHALL HAVE A MINIMUM THERMAL EFFICIENCY |
| OF 82% PER THE 2017 FBC-ENERGY SEC. R403.10.4. |
| |
| 7. MANUFACTURER?S SPECIFICATION SHEETS/INSTALLATION |
| MANUAL FOR HEATER EQUIPMENT TO VERIFY COMPLIANCE WITH |
| 2017 FBC FG SEC.305.1 OR 2017 FBC RES. SEC. G2408.1. |
| |
| 8. A SOLAR COVER OR A LIQUID COVER REQUIRED PER 2017 |
| FBC EC404.9.3 COVERS. OUTDOOR HEATED SWIMMING POOLS AND |
| OUTDOOR PERMANENT SPAS SHALL BE EQUIPPED WITH A |
| VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE OR A |
| LIQUID COVER OR OTHER MEANS PROVING TO REDUCE HEAT |
| LOSS. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 1:00 PM TO 4:00 PM |
| [email protected] |
| |