2020-08-12 10:50:06 | 1) SHOW THE LOCATION OF THE DRINING FOUNTAINS ON THE |
| ARCHITECTURAL FLOOR PLAN AND THE PLUMBING FLOOR PLAN. |
| WPB AMEND. TO FBC SEC. 107.2.1. |
| 2) A MINIMUM OF TWO DRINKING FOUNTAINS ARE REQUIRED PER |
| FBCACCESS. SEC. 211.2 & FBC-PLUMBING SEC. 410.3. |
| 3) WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS |
| SHALL HAVE A SMOOTH, HARD, NON-ABSORBENT SURFACE PER |
| FBC-BUILDING SEC. 1210.2.2. SECTION 1210.2.2 STIPULATES |
| THAT THE MATERIAL BE "HARD." THE INTENT OF THIS SECTION |
| IS THAT THE SURROUNDING MATERIAL SHOULD NOT BE OF A |
| TYPE THAT IS EASILY DAMAGED SUCH THAT THE MATERIAL |
| COULD BECOME ABSORBENT AND THUS, NOT READILY CLEANABLE |
| AND SANITIZED. PAINTED DRYWALL, EVEN WHERE COATED WITH |
| HIGHLY DURABLE PAINTS, DOES NOT MEET THE INTENT OF |
| SECTION 1210.2.2. THE TYPICAL MATERIALS USED FOR THIS |
| APPLICATION ARE CERAMIC TILE, FIBERGLASS REINFORCED |
| PLASTIC (FRP) PANELS, PHENOLIC PANELS, LAMINATED |
| PLASTIC PANELS, PAINTED STEEL AND STAINLESS STEEL. |
| 4) THE BACKFLOWS FOR THE IRRIGATION SYTEM AND THE |
| DOMESTIC WATE RSYSTEM WILL REQUIRE A SEPARATE PERMIT. |
| MANUFACTURER'S SPECIFICATIONS AND A SEPARATE PLUMBING |
| PERMIT SHALL BE SUBMITTED PRIOR TO THE INSTALLATION OF |
| THESE DEVICES. THE DEVICES MUST BE INSTALLED BY A |
| LICENSED PLUMBING CONTRACTOR.F.S.489.103. |
| 5) A SEPARATE PERRMIT WILL BE REQUIRED FOR THE GREASE |
| INTERCEPTOR. MANUFACTURER'S SPECIFICATIONS & DETAILS |
| AND FACTORY SIZING CALCULATIONS WILL BE REQUIRED TO BE |
| SUBMITTED PRIOR TO ISSUANCE OF THE INTERCEPTOR PERMIT. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |