2020-06-23 14:03:09 | 1) SHT. A0.0 NOTES THE OCCUPANT LOAD AS 38 PERSONS AND |
| SHT.A2.0 NOTES THE OCCUPANT LOAD AS 19 PERSONS. |
| CLARIFY. |
| 2) IF THE OCCUPANT LOAD EXCEEDS 15 PERSONS, SEPARATE |
| TOILET FACILITIES ARE REQUIRED FOR MALES AND FEMALES IN |
| ACCORDANCE WITH FBC-PLUMBING SEC.403.2 AND TABLE 403.1. |
| SINCE THIS IS CLASSIFIED AS A BUSINESS OCCUPANCY, THERE |
| SHALL BE ONE WATER CLOSET AND LAVATORY FOR THE FIRST 25 |
| MALES AND ONE WATER CLOSET AND LAVATORY FOR THE FIRST |
| 40 FEMALES PER FBC-PLUMBING TABLE 403.1. |
| 3) DUE TO THE OCCUPANT LOAD THE PLUMBING CODE REQUIRES |
| A DRINKING FOUNTAIN PER TABLE 403.1. THE DRINKING |
| FOUNTAIN SHALL COMPLY WITH FBC-ACCESS. SEC. 211 AND |
| FBC-PLUMBING SEC.410.3. |
| 4) SHT. A2.1 - DETAIL #1 - THE GRAB BAR ADJACENT TO THE |
| WATER CLOSET IS SHOWN AS 36 INCHES IN LENGTH. THE |
| MINIMUM LENGTH SHALL BE 42 INCHES IN ACCORDANCE WITH |
| FBC-ACCESS. SEC. 604.5.1. |
| 5) SHT. P1.1 - THE PLUMBING PLAN STILL SHOWS A SHOWER |
| ON THE EXTERIOR WHICH WAS SUPPOSED TO BE DELETED. |
| CLARIFY. |
| 6) SHT. P1.1 - BACKFLOW PREVENTION SCHEDULE - THE |
| BACKFLOW DEVICE FOR THE ICE MACHINE IS FOR CARBONATION |
| AND BEVERAGE DISPENSING MACHINES AND SHALL COMPLY WITH |
| ASSE 1024 PER FBC-PLUMBING SEC.608.13.10. THIS UNIT |
| DOES NOT. |
| 7) SHT. P1.1 - PLACE A NOTE ON THE PLANS THAT ALL THE |
| BACKFLOW PREVENTION DEVICES WILL BE LEAD FREE. 2ND |
| REQUEST |
| 8) SUBMIT A DETAIL SHOWING THE CONNECTION OF THE HOT |
| WATER RETURN LINE TO THE WATER HEATER COLD WATER LINE. |
| WPB AMEND. TO FBC SEC. 107.2.1. SHT. P1.1 DOES NOT SHOW |
| THIS CONNECTION. 2ND REQUEST. |
| 9) A BACKFLOW PREVENTION DEVICE MUST BE INSTALLED AT |
| THE WATER METER ON THE WATER SERVICE TO THIS STRUCTURE |
| PER THE CITY OF WEST PALM BEACH CROSS-CONNECTION |
| CONTROL MANUAL.THE DEVICE MUST BE A REDUCED PRESSURE |
| ZONE DEVICE AND MUST BE LEAD FREE. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |