Date |
Text |
2020-07-01 16:57:34 | INSUFFICIENT |
| |
| PLEASE SEE THE LIST BELOW FOR AN ANALYSIS OF THE |
| DEFICIENCIES IN INFORMATION REQUIRED BY SECTION 78-401 |
| OF THE CITY OF WEST PALM BEACH CODE AS PART OF THE |
| COMMUNICATION FACILITIES PLACEMENT PERMIT APPLICATION. |
| THE DEFICIENT INFORMATION MUST BE PROVIDED FOR STAFF TO |
| REVIEW THE PERMIT APPLICATION. PLEASE NOTE THAT STAFF |
| HAS ALSO INCLUDED SOME SUBSTANTIVE REVIEW COMMENTS, |
| THAT WHILE NOT RESULTING IN A DEFICIENT APPLICATION, |
| NEED TO BE ADDRESSED OR THE PERMIT WILL NOT BE |
| APPROVED. |
| |
| 1) UPDATED COMMENT: SURVEY OF UNDERGROUND FACILITIES - |
| THE BASE OF THE POLE IS BEING INSTALLED UNDERGROUND SO |
| THIS IS REQUIRED. |
| |
| A. THE SURVEY THAT WAS PROVIDED WITH THE APPLICATION |
| DOES NOT SHOW THE LOCATION OF THE UNDERGROUND UTILITY |
| FACILITIES THAT ARE INCLUDED ON THE ENGINEERING PLANS |
| (IT SPECIFICALLY STATES THAT UNDERGROUND UTILITIES AND |
| IMPROVEMENTS WERE NOT LOCATED IN NOTE #3). THE PROPOSED |
| POLE HAS A 10 FOOT DEEP UNDERGROUND BURIAL. THE |
| INFORMATION HAS NOT BEEN PROVIDED THAT THIS WILL NOT |
| IMPACT EXISTING UTILITIES (ALL OF WHICH ARE SHOWN LESS |
| THAN 10 FEET IN DEPTH). THE CROSS SECTION PLANS NEED TO |
| SHOW THE POLE FOUNDATION. POT HOLES ARE REQUIRED IF |
| PROPOSED POLE IS WITHIN TEN FEET OF EXISTING WATER, |
| SEWER OR STORM WATER FACILITIES. |
| |
| B. THE ENGINEERING PLAN MUST BE BASED OFF OF THIS |
| SURVEY INFORMATION. |
| |
| 2) PUBLIC UTILITY LETTERS, TELEPHONE, NATURAL GAS, |
| ELECTRIC SERVICE, AND TELEVISION CABLE - PUBLIC UTILITY |
| LETTERS NEED TO BE PROVIDED BY ANY PROVIDER WITHIN FIVE |
| (5) FEET OF THE PROPOSED POLE (AND THE BORE AND BORE |
| PITS IF INCLUDED ON THIS APPLICATION). PLEASE NOTE THAT |
| AS STATED PREVIOUSLY, THE UNDERGROUND INFORMATION WAS |
| NOT PROVIDED ON THE SURVEY. THE ENGINEERING PLAN STATES |
| THAT THE CONTRACTOR IS TO FIELD VERIFY UNDERGROUND |
| UTILITIES; HOWEVER, THE CITY CODE REQUIRES THAT THIS BE |
| PROVIDED PRIOR TO THE CITY APPROVAL. IF THERE ARE NO |
| UNDERGROUND UTILITIES IN THE AREA, THIS NEEDS TO BE |
| CLEARLY STATED ON THE PLANS AND HOW THIS INFORMATION |
| WAS DETERMINED. HOWEVER, THE ENGINEERING PLAN SHOWS A |
| GAS LINE IN THE VICINITY OF THE UNDERGROUND BORE AND |
| BORE PITS. |
| |
| 3) THE OVERALL HEIGHT OF THE POLE AND ANTENNA IS SHOWN |
| AS 32 FEET ON SHEET C3 ELEVATION & EQUIPMENT PLAN AND |
| 38 FEET 1 INCH ON SHEET S1 ASSEMBLY ELEVATIONS. BOTH |
| PLANS NEED TO SHOW THE SAME, ACCURATE HEIGHT. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| [email protected] |
| |
| |