Plan Review Notes For Permit 19070264 |
Permit Number |
19070264 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2019-09-11 08:14:20 | 9/11/2019 4TH GAS REVIEW **DENIED** WITH COMMENTS NOTE | | - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS TIME | | AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED | | UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. | | | | 1) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE | | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE | | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR | | INSTALLATION. 2017 FBC FUEL GAS SEC.410.1 OR 2017 FBC | | FUEL GAS RES. SEC. G2421.1. | | | | 2) SHOW ALL PIPE SIZES FOR EACH PIPE. WPB AMENDMENTS TO | | THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION | | DOCUMENTS. | | | | 3) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION | | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | 4) DO NOT RESUBMIT BEFORE SETTING UP A MEETING TO | | ADDRESS THE COMMENTS WITH THE PLAN REVIEWER | | | | ATELYO BELISLE | | PLUMBING INSPECTOR / | | PLUMBING PLANS EXAMINER | | AVAILABLE FROM 1:00 PM TO 4:00 PM | | [email protected] | | 561-805-6695 | | | 2019-08-22 16:16:25 | SEE PERMIT 19070181 FOR REVIEWS OF GAS | | | | PERMIT WAS SEPARATED SO ELECTRIC COULD DO SERVICE | | CHANGE JLEAHY |
|