2019-10-08 12:49:46RECEIVED BUDGET SUMMARY.
 TOTAL PROJECT EVALUATION ON SUMMARY IS $25,566,543.00
 IN THE DETUCTION SECTIONS ROOFING AND VEHICLE BARRIER
 WERE REMOVED AS THESE VALUES WERE IMPLIED TO BE IN
 SEPARATE PERMITS.
 THOSE VALUES WOULD REMAIN IN THE MASTER PERMIT.
 ROOFING SUB PERMIT VALUE WOULD ALREADY BE INCLUDED.
 ROOFING SUBMITTAL WOULD BE REQUIRED AS NO PRODUCT
 APPROVALS PROVIDED WITH THE MASTER.
 VEHICLE BARRIER IS INCLUDED IN MASTER AS WELL AND ONLY
 A SUBMITTAL FOR ENGINEERING WOULD BE PROVIDED.
 SUB-PERMIT CAN BE APPLIED FOR THE BARRIER SYSTEM IF
 SEPARATE CONTRACTOR, BUT THE VALUE WOULD BE IN THE
 MASTER.
 REVISED VALUE IS TOTAL PROJECT VALUE PLUS ROOF AND
 BARRIER.
 25,566,543.00+485,000.00+60,000.00=$26,111,543.00
  
2019-10-08 10:33:06SEE PROVISOS AND DEFERRED SUBMITTALS ON SHEET LS-0.