2019-07-19 19:00:27 | PLAN |
| REVIEW COMMENTS |
| |
| 2ND REVIEW: FBC SIXTH EDITION (2017) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) COMPLIED. |
| |
| 2) COMPLIED. |
| |
| 3) PARTIALLY COMPLIED. THE INFORMATION PROVIDED IS |
| INCOMPLETE. THE INSTALLATION SCHEDULE SPECIFIES THAT |
| THE SUBSTRATE IS WOOD FOR BOTH THE FIRST AND SECOND |
| FLOORS. THE PROPERTY APPRAISER'S WEBSITE INDICATES THAT |
| THE FIRST FLOOR IS CBS AND THE SECOND FLOOR IS WOOD |
| FRAME STUCCO. THE ACCORDION SHUTTERS ARE ALWAYS |
| INSTALLED VERTICALLY NOT HORIZONTALLY AS SPECIFIED ON |
| THE SCHEDULE. THE TYPE OF ANCHOR IS LISTED AS ALL POINT |
| SOLID SET IN ONE PLACE AND TAPCON 2 1/4" IS LISED IN |
| THE SCHEDULE. THE SHUTTER MOUNTING IS SPECIFIED AS #14 |
| AND I WAS UNABLE TO DETERMINE WHICH MOUNTING YOU WILL |
| USE. PLEASE CIRCLE THE MOUNTINGS AND ANCHOR SPACINGS |
| YOU WILL USE IN THE PRODUCT APPROVAL DETAILS AND ANCHOR |
| SCHEDULES. FBC 107.2.1 FBC - R 301.2.1.2 SUBMIT TWO |
| COPIES OF AN INSTALLATION SCHEDULE AND KEY PLAN FOR THE |
| STORM PANELS. SPECIFY THE OPENING SIZE, THE WIND |
| PRESSURES, TYPE OF ANCHOR, ANCHOR SPACING, EDGE |
| DISTANCE, PANEL LENGTH, PANEL SPAN, SEPARATION DISTANCE |
| FROM PANEL TO GLASS AND THE APPLICABLE SECTION NUMBER |
| FROM THE INSTALLATION DRAWINGS. I HAVE INCLUDED A LINK |
| TO THE CONSTRUCTION SERVICES DEPARTMENT SITE THAT HAS |
| MANY OF THE RELATED FORMS INCLUDING THE SCHEDULE FOR |
| INSTALLATION OF OPENING PROTECTIVE DEVICES. |
| HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/ |
| |
| |
| |
| |