Plan Review Notes For Permit 19061116 |
Permit Number |
19061116 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2019-06-28 11:04:57 | | | 1) SUBMIT TWO SETS OF A FLOOR PLAN SHOWING THE SCOPE OF | | WORK AND LOCATION OF THE SHOWER WITH SHOWER PAN | | DETAILS. FBC 107.2.1 | | | | 2) THE PLUMBING WORK TO BE DONE MUST BE DONE BY A | | LICENSED PLUMBING CONTRACTOR PER FL. STATUTE 489. | | SUBMIT A PERMIT APPLICATION FROM A CURRENTLY LICENSED | | PLUMBING CONTRACTOR. A CGC CANNOT INSTALL THE SHOWER | | PAN OR ANY PLUMBING ITEMS. WPB AMEND. TO FBC SEC. | | 105.1. | | | | 3) INDICATE ON THE REQUESTED PLANS IF A NEW SHOWER | | VALVE WILL BE INSTALLED. THE VALVE SHALL BE | | THERMOSTATIC OR PRESSURE-BALANCED.WPB AMEND. TO FBC | | SEC. 107.2.1. | | | | 4) MATERIALS USED AS A BASE FOR WALL TILE IN TUB AND | | SHOWER AREAS AND WALL AND CEILING PANELS IN SHOWER | | AREAS SHALL BE OF MATERIALS LISTED IN 2017 FBC TABLE | | 2509.2. INDICATE TYPE OF MATERIAL ON REQUESTED PLANS. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|