2021-06-15 06:37:251) THE GAS DRAWING SHOWS THE 2 PSI LINE GOING TO THE
 EXISTING KITCHEN. HOW WILL THE EXISTING APPLIANCES BE
 PROTECTED FROM OVERPRESSURE? WILL EACH APPLIANCE BE
 PROTECTED WITH A REGULATOR OR WILL ONE REGULATOR BE
 INSTALLED ON THE LINE TO THE KITCHEN? CLEARLY SHOW ON
 THE PLANAS TO WHAT WILL BE DONE.
 2) A LISTED SHUTOFF VALVE SHALL BE INSTALLED
 IMMEDIATELY AHEAD OF EACH REGULATOR. FBC-FUEL GAS
 SEC.409.4.
 3) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN 1 FOOT OF EITHER SIDE OF THE MP
 REGULATOR. FBC-FUEL GAS SEC. 410.2 (7).2ND REQUEST.
 4) A REGULATOR, SHUTOFF VALVE AND UNION IS REQUIRED AT
 THE BOILER.FBC-FUEL GAS SEC.409.4, FBC-FUEL GAS SEC.
 410.2 (7), 410.1.
 5) SUBMIT A PIPING DETAIL FOR THE PIPING AT THE
 GENERATORS.WPB AMEND. TO FBC SEC. 107.2.1.
 6) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE
 REGULATORS.REGULATORS SHALL BE APPROVED FOR OUTDOOR
 USE. FBC-FUEL GAS SEC. 410.1.2ND REQUEST.
 7) SHOW THE DISTANCE FROM THE REGULATORS TOTHE FURTHEST
 OUTLET ON THE LOW PRESSURE SIDE OF EACH REGULAOR. THIS
 IS REQUIRED TO ENSURE CORRECT SIZING OF THE EXISTING
 SYSTEM. FBC-FUEL GAS SEC.401.3, 401.4.401.8.
 8) IDENTIFY ON THE REGULATOR SPECIFICATIONS WHICH
 REGULATOR MODEL IS BEING INSTALLED.THE REGULATOR SHALL
 BE CAPABLE OF HANDLING THE BTU LOAD OF THE APPLIANCE OR
 THE EQUIPMENT. 2017 FBC-FUEL GAS SEC.410.2 (3). 2ND
 REQUEST.
 9) IDENTIFY EACH APPLIANCE IN THE KITCHEN AND THE
 CORRESPONDING BTU LOAD. WPB AMEND. TO FBC SEC. 107.2.1.
 10) PLACE THE ENTIRE BTU LOAD OF THE SYSTEM ON THE
 PLANS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved