2020-01-06 17:12:15 | BUILDING REVIEW APPROVED WITH PROVISO: |
| 1) REVISE BUILDING AREA SHOWN ON SHEET G-001 AND SHEET |
| G-101 TO MATCH. |
| |
| 2) AREA OF REFUGE: CLEARLY MARK THE DOOR PROVIDING |
| ACCESS TO THE REFUGE AREA. SEE SEC 1007.6.5 2003 |
| INTERNATIONAL BUILDING CODE FOR SPECIFIC REQUIREMENTS. |
| PROVIDE INFORMATION FOR REVIEW., |
| |
| 3) TYPE III-B CONSTRUCTION REQUIRES ALL EXTERIOR |
| BEARING WALLS TO BE 2 HOUR FIRE RATED. VERIFY IN FIELD |
| 2 HOUR CONCRETE BLOCK FOR ALL 2 HOUR FIRE RATED WALLS |
| SHOWN ON PLANS. |
| |
| 4) PROVIDE ROOFING PRODUCT APPROVAL AND CLEARLY MARK |
| ASSEMBLY TO BE INSTALLED. |
| NOTE: IF THE SELECTED ASSEMBLY DOESN'T MEET THE DESIGN |
| PRESSURES FOR ALL ROOF ZONES, THEN SIGNED AND SEALED |
| RAS 117 CALCULATIONS ARE REQUIRED. |
| |
| 5)THE SUBMITTAL NOA: 16-0219.01 TC-5 SERIES STEEL ROOF |
| CURB FOR TRANE ROOF TOP UNITS. |
| PLEASE REVISE ROOFTOP MECHANICAL UNIT CURB AND |
| ATTACHMENT RESPONSE LETTER. THE SECOND PARAGRAPH OF THE |
| LETTER STATS THAT 2 BRACKETS ARE REQUIRED PER SIDE FOR |
| A TOTAL OF 4 BRACKETS EACH UNIT. IF TWO BRACKETS ARE |
| REQUIRED PER SIDE, THEN THE TOTAL IS 8 BRACKETS PER |
| UNIT NOT 4. |
| |
| 6) THE SUBMITTAL NOA: 17-1017.14 TRULITE SERIES 3100 |
| REGISTER ALUMINUM STOREFRONT/ WINDOW WALL SYSTEM- L. M. |
| I. |
| NEED TO PROVIDE THE NOA FOR TRULITE DOORS AS SPECIFIED |
| ON THE STOREFRONT NOA. |
| |
| 7- SEPARATE PERMIT IS REQUIRED FOR THE DIESEL TANK |
| SHOWN ON PLANS. |
| |
| |
| ART IN PUBLIC PLACES PROVISO: |
| PLEASE CONTACT THE PERSON BELOW TO COORDINATE THIS |
| REQUIREMENT AND TO PASS THIS REVIEW: |
| MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR |
| 822-1515 E-MAIL: [email protected] |
| |