Date |
Text |
2019-11-08 17:00:22 | SEE ITEM #6 ON 3RD BUILDING REVIEW DONE BY JULIO GOMEZ. |
| |
| |
| ORIGINAL COMMENT: |
| 3RD REQUEST. THE SUBMITTED NOA: 14-0827.18TAMKO |
| MODIFIED BITUMEN ROOF SYSTEM OVER STEEL DECK HAS |
| VARIOUS SUB-SYSTEMS LISTED WITHIN THE REPORT BUT NONE |
| OF THE SUB-SYSTEMS WERE IDENTIFIED AS THE ONE BEING |
| INSTALLED. : FOR ALL ROOFING PRODUCTS PLEASE IDENTIFY |
| ALL ROOFING SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES |
| FOR ROOF ZONE # 1. REVIEW THE PRODUCT APPROVAL |
| LIMITATIONS, IF ENHANCED FASTENING IS ALLOWED |
| (LIMITATION #7 ALLOWS ENHANCED FASTENING, LIMITATION # |
| 9 DOES NOT ALLOW ENHANCED FASTENING) FOR ROOF ZONES 2 & |
| 3. FASTENER DENSITIES SHALL BE INCREASED FOR BOTH |
| INSULATION & THE BASE SHEET AS CALCULATED IN COMPLIANCE |
| WITH ROOFING APPLICATION STANDARDS RAS 117. CALCULATION |
| PREPARED, SIGNED AND SEALED BY A FLORIDA REGISTERED |
| PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT. |
| 1609.6.4.4.1 COMPONENTS & CLADDING. |
| |
| RESPONSE: |
| APPROVED ASSEMBLY WAS NOT SELECTED. AND, NEED SIGNED |
| AND SEALED RAS 117 CALCULATIONS FOR SELECTED ASSEMBLY |
| (GENERAL LIMITATION #7 ONLY). IF THE SELECTED ASSEMBLY |
| IS LIMITED BY GENERAL LIMITATION #9 AND THE ASSEMBLY |
| DOESN'T MEET THE DESIGN PRESSURES FOR ALL ROOF ZONES, |
| THEN IT CAN NOT BE USED. |
| NOTE: ALL PRODUCT APPROVALS CAN BE SUBMITTED LATER AS |
| DEFERRED SUBMITTAL. ADVICE IF PREFER TO SUBMIT PRODUCT |
| APPROVALS AS DEFERRED SUBMITTAL. |