2019-08-19 14:52:20 | 2ND MECHANICAL REVIEW FAIL |
| |
| 1) M2.1 & M2.2: AUTOMATICALLY CONTROLLED SHUTOFF |
| DAMPERS ARE REQUIRED FOR THE O/A DUCTS AT EACH AIR |
| HANDLER LOCATION - SECTION C403.2.4.3 FBC EC. |
| |
| 2) M2.1 & M2.2: PLEASE SHOW THE FLEX DUCT SIZES- |
| SECTION 603.2 FBC M. |
| |
| 3) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE AC SYSTEMS |
| INCLUDING TYPE AND SIZES OF CONDENSATE PIPING, PIPING |
| RUNS, PIPING SUPPORTS INSIDE AND ABOVE THE ROOF, AND |
| DISCHARGE LOCATIONS- SEE SECTION 307.2 FBC M. |
| |
| 4) PLEASE PROVIDE AN ENLARGED COMPRESSOR ROOM PLAN AND |
| EQUIPMENT SCHEDULE. IT APPEARS THAT FUEL OIL TANKS WILL |
| BE INSTALLED IN THE ROOM WHICH REQUIRES THE ROOM, THE |
| TANK INSTALLATION, AND VENTILATION SYSTEM TO BE IN |
| COMPLIANCE WITH NFPA 30. A) PLEASE SUBMIT |
| MANUFACTURER?S SPECIFICATIONS FOR THE TANKS. B) PROVIDE |
| THE CLASSIFICATION OF THE FUEL AND SUBMIT AN MSDS |
| SHEET- SECTION 4.3.1. C) PROVIDE EXHAUST VENTILATION |
| CALCULATIONS FOR EF-4 AND INDICATE THE SEQUENCE OF |
| OPERATION- SECTION 24.10.1 NFPA 30, AND SECTION 510.2 |
| FBC M. |
| |
| 5) REQUIRED SUBMITTALS LISTED BELOW SHALL BE PROVIDED |
| WITH THE CORRECTED PLANS OR MAY BE DEFERRED BY REQUEST. |
| ALL SUBMITTALS SHALL BEAR THE SHOP DRAWING APPROVAL |
| STAMP BY THE ENGINEER OF RECORD. |
| |
| 1) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR |
| INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT (AS |
| NOTED ABOVE IN COMMENT #10). |
| 2) C0, N02, CO2, FV SENSORS AND CONTROLLERS. |
| 3) MOTORIZED DAMPERS. |
| 4) DUCT SMOKE DETECTORS. |
| 5) FIRE DAMPERS |
| 6) GENERATOR |
| 7) FUEL OIL TANKS |
| 8) AIR COMPRESSOR |
| |
| ALL COMMENTS FROM PREVIOUS PLAN REVIEW |
| |
| CHRIS MONTELLO |
| 561-805-6733 |
| |
| |
| |
| |
| |
| |