2019-08-19 14:52:202ND MECHANICAL REVIEW FAIL
  
 1) M2.1 & M2.2: AUTOMATICALLY CONTROLLED SHUTOFF
 DAMPERS ARE REQUIRED FOR THE O/A DUCTS AT EACH AIR
 HANDLER LOCATION - SECTION C403.2.4.3 FBC EC.
  
 2) M2.1 & M2.2: PLEASE SHOW THE FLEX DUCT SIZES-
 SECTION 603.2 FBC M.
  
 3) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE AC SYSTEMS
 INCLUDING TYPE AND SIZES OF CONDENSATE PIPING, PIPING
 RUNS, PIPING SUPPORTS INSIDE AND ABOVE THE ROOF, AND
 DISCHARGE LOCATIONS- SEE SECTION 307.2 FBC M.
  
 4) PLEASE PROVIDE AN ENLARGED COMPRESSOR ROOM PLAN AND
 EQUIPMENT SCHEDULE. IT APPEARS THAT FUEL OIL TANKS WILL
 BE INSTALLED IN THE ROOM WHICH REQUIRES THE ROOM, THE
 TANK INSTALLATION, AND VENTILATION SYSTEM TO BE IN
 COMPLIANCE WITH NFPA 30. A) PLEASE SUBMIT
 MANUFACTURER?S SPECIFICATIONS FOR THE TANKS. B) PROVIDE
 THE CLASSIFICATION OF THE FUEL AND SUBMIT AN MSDS
 SHEET- SECTION 4.3.1. C) PROVIDE EXHAUST VENTILATION
 CALCULATIONS FOR EF-4 AND INDICATE THE SEQUENCE OF
 OPERATION- SECTION 24.10.1 NFPA 30, AND SECTION 510.2
 FBC M.
  
 5) REQUIRED SUBMITTALS LISTED BELOW SHALL BE PROVIDED
 WITH THE CORRECTED PLANS OR MAY BE DEFERRED BY REQUEST.
 ALL SUBMITTALS SHALL BEAR THE SHOP DRAWING APPROVAL
 STAMP BY THE ENGINEER OF RECORD.
  
 1) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR
 INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT (AS
 NOTED ABOVE IN COMMENT #10).
 2) C0, N02, CO2, FV SENSORS AND CONTROLLERS.
 3) MOTORIZED DAMPERS.
 4) DUCT SMOKE DETECTORS.
 5) FIRE DAMPERS
 6) GENERATOR
 7) FUEL OIL TANKS
 8) AIR COMPRESSOR
  
 ALL COMMENTS FROM PREVIOUS PLAN REVIEW
  
 CHRIS MONTELLO
 561-805-6733
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved