2019-04-30 16:45:19 | PLUMBING 2ND REVIEW COMPLETED**DENIED** |
| |
| 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD |
| CALCULATION IS NO LONGER ALLOWED TO BE USED IN |
| DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC |
| 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION |
| ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT |
| REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED |
| THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET |
| FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS |
| MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING |
| SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, |
| FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT |
| THE PUMP. |
| |
| 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, |
| 4.4.9.1 |
| |
| 3) NOTE ON PLAN REFERS TO HEATER MIN EFF MIN AS 78%. |
| GAS FIRED POOL HEATERS SHALL HAVE A MINIMUM THERMAL |
| EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC. |
| R403.10.4. THE SUBMITTED SPECS DO NOT SHOW THIS. |
| |
| |
| TIM HUNT |
| PLUMBING PLANS EXAMINER/ PLUMBING INSPECTOR |
| BUILDING DIVISION |
| CITY OF WEST PALM BEACH |
| 401 CLEMATIS STREET, 1ST FLOOR |
| WEST PALM BEACH, FL 33401 |
| 561-248-2703 |
| [email protected] |
| [email protected] |
| |