2019-02-12 16:51:56 | FFPC 1-1.14,2015 PLAN REVIEW: | | 1.14.1 WHERE REQUIRED BY THE AHJ FOR NEW CONSTRUCTION, | | MODIFICATION, OR REHABILITATION, CONSTRUCTION DOCUMENTS | | AND SHOP DRAWINGS SHALL BE SUBMITTED, REVIEWED, AND | | APPROVED PRIOR | | TO THE START OF SUCH WORK AS PROVIDED IN SECTION 1.14. | | 1.14.2 THE APPLICANT SHALL BE RESPONSIBLE TO ENSURE | | THAT THE FOLLOWING CONDITIONS ARE MET: | | (1) THE CONSTRUCTION DOCUMENTS INCLUDE ALL OF THE FIRE | | PROTECTION REQUIREMENTS. | | (2) THE SHOP DRAWINGS ARE CORRECT AND IN COMPLIANCE | | WITH THE APPLICABLE CODES AND STANDARDS. | | (3) THE CONTRACTOR MAINTAINS AN APPROVED SET OF | | CONSTRUCTION | | DOCUMENTS ON SITE. | | | | PROVIDE THE FOLLOWINGS: | | A.LIST THE TYPE OF COMMODITIES THAT WOULD BE STORED IN | | THE RACKS. | | B.HOW WOULD THE COMMODITIES BE PACKAGED- ON WOOD ARE | | PLASTIC PALLETS. ENCAPSULATED WITH PLASTIC WRAP. | | C.THE BUILDING HAS A FIRE SPRINKLER SYSTEM. FIRE | | SPRINKLER CONTRACTOR SHALL PROVIDE A LETTER STATING | | THAT THE FIRE PROTECTION SYSTEM WILL PROTECT THE | | STORAGE HAZARD PER FFPC 2015 AND NFPA 13. THE CODE MAY | | REQUIRE ADDITIONAL PROTECTION IN THE RACKS. IF SO THE | | CONTRACTOR SHALL SUBMIT FIRE PROTECTION DRAWINGS TO THE | | BUILDING DEPARTMENT FOR APPROVAL. | | |
|