Date |
Text |
2019-03-18 10:19:52 | 1ST REVIEW: FBC 2017 6TH EDITION |
| 1ST REVIEW FBC 2017 EXISTING BUILDING |
| |
| FAILED |
| |
| 1) THE APPLICATION IS UNDERVALUED. PROVIDE CONTRACT |
| AMOUNT FOR ENTIRE SCOPE OF WORK OR VALUE FOR FULL |
| SCOPE. |
| FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| 2) PROVIDE TEST REPORTS FROM A THIRD PARTY TESTING LAB |
| FOR SOUND INSULATION PRODUCT TO DEMONSTRATE COMPLIANCE |
| WITH THE SECTIONS BELOW. |
| |
| FBC 603.1 FLAME SPREAD; INSULATION BETWEEN A FINISHED |
| FLOOR AND SOLID DECKING W/O AN INTERVENING SPACE |
| W/FLAME SPREAD INDEX OF 200 OR LESS. |
| |
| FBC 1207.2 AIR-BORNE SOUND. |
| WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES |
| SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM |
| PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION |
| CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) |
| FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM |
| E 90. |
| |
| 1207.3 STRUCTURE-BORNE SOUND. |
| FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR |
| BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA |
| WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION |
| CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD |
| TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492. |
| |
| STEVEN KENNEDY, CBO |
| ASSISTANT BUILDING OFFICIAL |
| (561) 805-6710 |
| [email protected] |
| |