2019-04-23 05:43:141) SUBMIT MANUFACTURER'S DETAILS/SPECIFICATIONS FOR THE
 POOL SHOWER. THE RESPONSE NARRATIVE STATES THAT THE
 SHOWER INFORMATION HAS BEEN ELIMINATED AND TO REFER TO
 THE MASTER PERMIT FOR THE SHOWER DETAIL.I COULD NOT
 FIND ANY DETAIL FOR THE SHOWER IN THE MASTER PLANS.
 THERE IS STILL ONE MANUFACTURER'S SPECIFICATION SHEET
 INCLUDED IN THIS SUBMITTAL BUT IT DOES NOT PROVIDE THE
 REQUIRED INFORMATION REQUESTED FROM THE FIRST REVIEW.
 2ND REQUEST.
 2) THE SPACING OF THE GUTTER DRAINS SHALL COMPLY WITH
 2017 FBC - BUILDING SEC. 454.1.6.5.3.1. 2ND REQUEST.
 3) THE PLANS REFER TO THE DISCHARGE OF RAINWATER TO THE
 SANITARY SYSTEM (SHT.SP-1.05) AND THE POOL MAINTENANCE
 LINE TO THE SANITARY.STORMWATER AND THE POOL MAINTENACE
 LIONE CANNOT DRAIN TO THE SANITARY SYSTEM PER CITY
 ORDINANCE ARTICLE III, SEC.90-126 (B) (5). PLEASE
 CONTACT MANNY GONZALEZIN THE CITY OF WEST PALM BEACH
 ENGINEERING DEPT. FOR FURTHER DIRECTION. HE CAN BE
 REACHED AT 561-494-1040.
 4) PLACE THE CALCULATIONS FOR THE CARTRIDGE FILTRATION
 RATE ON THE POOL PLANS. WPB AMEND. TO FBC SEC. 107.2.1.
 5) PLACE THE SPECIFIC ADDRESS OF THIS PROJECT ON ALL OF
 THE PLAN SHEETS AND ON THE PERMIT APPLICATION. SEE PLAN
 SHEETS SP-1.01, SP-1.03, E-4.0.0, AND E-5.0.1. 2ND
 REQUEST.
 6) SHT.SP-2.04 - LEVEL 5 SWIMMING POOL LEGEND - NOTE
 "H" - REFERS TO THE DISCHARGE OF THE POOL MAINTENANCE
 LINE TO THE STORM DRAINAGE SYSTEM. CITY ORDINANCE
 CHAPTER 90, ARTICLE V, SEC. 90-203 ( A) ONLY PERMITS
 STORMWATER TO BE DISCHARGED INTO THE STORMWATER SYSTEM.
 ALSO, THERE IS A NOTE ON THE POOL EQUIPMENT ROOM PIPING
 PLAN THAT THE 4 INCH MAINTENANCE DRAIN LINE IS TO
 DISCHARGE TO THE SANITARY SEWER. THIS IS NOT PERMITTED
 PER CITY ORDINANCE CHAPTER 90, ARTICLE III, SEC.90-126
 (B) (5). PLEASE CONTACT MANNY GONZALEZ IN THE CITY OF
 WEST PALM BEACH ENGINEERING DEPT. FOR FURTHER
 DIRECTION. HE CAN BE REACHED AT 561-494-1040. 2ND
 REQUEST.
 7) A SEPARATE GAS PERMIT WILL BE REQUIRED FOR THE
 INSTALLATION OF THE GAS POOL HEATER. THE MASTER SET OF
 PLANS HAS A NOTE STATING " POOL HEATER BY OTHERS."
 MANUFACTURER'S SPECIFICATIONS FOR THE POOL HEATER ALONG
 WITH DETAILS SHOWING THE TYPE OF VENT, LOCATION, SIZE,
 TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING
 DETAILS OF THE GAS VENT AND COMBUSTION AIR CALCULATIONS
 SHALL BE SUBMITTED ALONG WITH THE GAS PERMMIT
 APPLICATION.2017 FBC-FUEL GAS SECS. 502 THRU 505. WPB
 AMEND. TO FBC SEC. 105.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved