2019-03-20 14:24:22 | GAS 1ST REVIEW**DENIED**NOTE - A COMPREHENSIVE REVIEW |
| COULD NOT BE DONE AT THIS TIME AND ADDITIONAL PLAN |
| REVIEW COMMENTS MAY BE GENERATED UPON THE RE-REVIEW OF |
| SUBMITTED CORRECTIONS. |
| |
| |
| 1) A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL |
| PACKAGE OR THEN SHOWING A NEW 1" GAS LINE CONNECTING TO |
| THE EXISTING SYSTEM FEEDING 2 NEW GAS WATER HEATER'S. A |
| GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT THIS TIME. A |
| SEPARATE GAS PERMIT AND PLANS WILL BE REQUIRED FOR A |
| CONTRACTOR TO PERFORM THE RELATED WORK. PROVIDE |
| COMPLETE PLANS AND GAS RISER THAT REFLECTS THE ENTIRE |
| SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| |
| 2) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC-FUEL |
| GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC-RES SEC. |
| G2413.4.1, G2413.4.2. |
| |
| 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1 |
| |
| 4) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| G2413.4 (1 ) THROUGH G2413.4 (21). |
| |
| 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017 |
| FBC-FUEL GAS CODE SEC.304.1 FOR ALL 3 WATER HEATERS. |
| |
| 6) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE, |
| TERMINATION POINT, HEIGHT ABOVE THE ROOF AND ANCHORING |
| DETAILS OF THE GAS VENT(S) PER 2017 FBC-FUEL GAS SECS. |
| 502 THRU 505 OR 2017 FBC-RES. SEC.G2426 THROUGH G2439 |
| |
| 7) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 |
| FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| |
| 8) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL |
| GAS SEC.304.9.3 OR FBCR G2407.9.3 |
| |
| 9) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| |
| 10) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| INSTALLATION. 2014 FGC SEC.410.1, 2017 FBC-RES. SEC. |
| G2421.1 |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| TIM HUNT |
| PLUMBING INSPECTOR/PLUMBING PLAN EXAMINER |
| BUILDING DIVISION |
| CITY OF WEST PALM BEACH |
| 561-248-2703 |
| [email protected] |
| |
| |
| |
| |
| |
| |
| |
| |