Plan Review Notes For Permit 18110946 |
Permit Number |
18110946 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-12-10 08:52:46 | 1) INDICATE ON BOTH SETS OF PLANS IF THE TANK WILL BE | | FILLED WITH LP GAS AT THE TIME OF INSTALLATION OR WILL | | REMAIN EMPTY. WPB AMEND. TO FBC SEC. 107.2.1. | | 2) SHOW THE DISTANCE FROM THE END OF THE TANK TO THE | | EDGE OF THE DRIVEWAY. CONTAINERS LOCATED WITHIN 10 FEET | | OF A DESIGNATED PARKING LOCATION SHALL CCOMPLY WITH | | NFPA 58 SEC.6.6.6.1 (B), (C), (E). | | 3) A CORROSION PROTECTION SYSTEM SHALL BE INSTALLED ON | | NEW INSTALLATIONS OF UNDERGROUND STEEL CONTAINERS PER | | NFPA 58 SEC. 6.6.6.1 (I). SUBMIT INFORMATION & DETAILS | | AS TO HOW THE REQUIRED CATHODIC PROTECTION WILL BE | | PROVIDED.THE CORROSION PROTECTION SHALL INCCLUDE THE | | FOLLOWING: | | 1) A CONTAINER COATING COMPLYING WITH NFPA 58 | | SEC.5.2.1.11. | | 2) A CATHODIC PROTECTION SYSTEM THAT CONSISTS OF A | | SACRIFICIAL ANODE(S) OR AN IMPRESSED CURRENT ANODE. | | 3) A MEANS TO TEST THE PERFORMANCE OF THE CATHODIC | | PROTECTION SYSTEM IN ACCORDANCE WITH NFPA 58 SEC. | | 6.17.3. | | SHOW THE NUMBER/TYPE OF ANODE, WWIRE SIZE ETC. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | |
|