Plan Review Notes
Plan Review Notes For Permit 18110020
Permit Number 18110020
Review Stop G
Sequence Number 1
Notes
Date Text
2018-11-27 09:34:571) PLANS DRAWN IN PENCIL ARE UNACCEPTABLE. WPB AMEND.
 TO FBC SEC. 107.2.1.
 2) SUBMIT TWO COPIES OF AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF PIPE
 PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2017
 FBC-R SEC. G2413.4.1, G2413.4.2.
 3) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, AND
 ALL PIPE SIZES. WPB AMENDMENTS TO FBC SEC.107.2.1.
 4.) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL
 BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS
 SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37)
 OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES
 G2413.4 (1 ) THROUGH G2413.4 (21).
 5.) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS
 METER) TO THE MOST REMOTE OUTLET IN THE BUILDING AND /
 OR SYSTEM PER THE 2017 FBC-FUEL GAS SEC.402.4.1,
 402.4.2, OR 2017 FBC-RES. SEC. G 2413.4.1, G2413.4.2.
 6) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3
 THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3.
 7) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54,
 NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2017 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS
 FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT
 THE TIME OF INSPECTION. FGC SEC.305.1, FBC-RES.
 SEC.G2408.1.
 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3.
 9) THE PLANS INDICATE AN EXISTING GAS METER AND CITY
 RECORDS DO NOT SHOW SHOW AN EXISTING GAS SYSTEM FOR
 THIS ADDRESS. THE EXISTING SYSTEM MUST BE PERMITTED.
 THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED
 INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE
 EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE
 EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM
 THAT SHOWS THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD
 OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO
 EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH
 OF PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE
 EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE
 SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE
 REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES.
 FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR
 SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3.
 10) THE GENERATOR EXHAUST SHALL BE LOCATED IN
 ACCORDANCE WITH THE INSTALLATION MANUAL IN RELATION TO
 BUILDING OPENINGS INCLUDING SOFFITT VENTS. SHOW THE
 DISTANCE ON THE PLANS. 2017 FBC-FUEL GAS SEC. 616.1.
 11) THE GENERATOR SHALL MEET THE REQUIREMENTS OF UL
 2200. 2017 FBC-FUEL GAS SEC.616.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved