Plan Review Notes
Plan Review Notes For Permit 18101337
Permit Number 18101337
Review Stop B
Sequence Number 3
Notes
Date Text
2019-02-13 09:21:49PROVISO
  
 1. THE CITY OF WEST PALM BEACH WILL INSPECT ALL ASPECTS
 OF THE BUILDING STRUCTURE WITH THE EXCEPTION OF THE
 BOLTED AND WELDED CONNECTIONS. PLEASE HAVE A 3RD PARTY
 FLORIDA PROFESSIONAL ENGINEER DO THE INSPECTIONS ON ALL
 OF THE BOLTED AND WELDED CONNECTIONS AND HAVE THE
 SIGNED AND SEALED AFFIDAVIT ON THE JOBSITE AT THE TIME
 OF THE FRAMING INSPECTION.
  
 2. PLEASE PROVIDE PRODUCT APPROVALS APPROVED BY THE
 DESIGNER OF RECORD FOR:
 (A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, LIGHTWEIGHT
 CONCRETE INSULATION, ROOF TOP VENTILATORS
 (G) EXTERIOR PRE-ENGINEERED A/C STANDS
  
 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR
 DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE
 IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING.
 THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED
 UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
 APPROVED BY THE BUILDING OFFICIAL.
  