Plan Review Notes For Permit 18100235 |
Permit Number |
18100235 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-10-10 09:21:20 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS & INSTALLATION | | MANUAL FOR THE BATHTUB.THE BATHTUB SHALL COMPLY WITH | | THE STANDARDS LISTED IN 2017 FBC-RESIDENTIAL TABLE | | P2701.1. | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE BATHTUB | | VALVE. HOT WATER SUPPLIED TO BATHTUBS SHALL BE LIMITED | | TO 120 DEGREES FAHRENHEIT AND SHALL COMPLY WITH THE | | REQUIREMENTS OF 2017 FBC-RESIDENTIAL SEC.P2713.3. | | 3) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF THE NEW | | TUB. IS THE TUB BEING ADDED TO AN EXISTING BATHROOM OR | | IS A NEW BATHROOM BEING CREATED? CLARIFY.**NOTE - A | | PREVIOUS PERMIT APPLICATION WAS SUBMITTED FOR THIS IN | | JULY THAT SHOWED THE BATHTUB BEING ADDED IN A DRESSING | | ROOM. THIS WOULD NOW BE CONSIDERED A BATHROOM AND | | COMPLIANCE Y WITH 2017 FBC-RES.SEC. R303.3 FOR REQUIRED | | AGGREGATE GLAZING AND VENTILATION REQUIREMENTS WILL BE | | REQUIRED. REFER TO THE EXCEPTION FOR ALTERNATE | | COMPLIANCE. | | 4) INDICATE ON THE PLAN IF ANY OTHER WORK WILL BE | | ASSOCIATED WITH THIS INSTALLATION ( BUILDING, | | ELECTRICAL, ETC.) AND IF SO SUBMIT A COMPLETE SET OF | | PLANS THAT REFLECT THE ENTIRE SCOPE OF WORK TO BE DONE. | | WPB AMEND. TO FBC SEC. 107.2.1. | | 5) THE WALLS SURROUNDING THE BATHTUB SHALL COMPLY WITH | | THE 2017 FBC-RES. SEC.R307.2. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|