2018-11-01 09:34:44 | GAS PLAN REVIEW |
| A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL |
| PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT |
| THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE |
| REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. |
| PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT |
| SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE |
| SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| |
| GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE |
| FBC-R, SEC. G2404.3. |
| GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL |
| GAS SEC. 301.3. |
| |
| A SEPARATE PERMIT AND PLANS IS REQUIRED FOR THE GAS |
| INSTALLATION OR MODIFICATION OF SYSTEM. |
| |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |
| GAS PERMIT APPLICATION REQUIREMENTS |
| |
| EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL |
| BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING |
| IN THE CITY OF WEST PALM BEACH: |
| |
| 1. SUBMIT TWO COPIES OF AN ISOMETRIC DRAWING THAT |
| CLEARLY SHOWS THE LENGTH OF ALL CUT SECTIONS OF PIPE |
| PER 2017 FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2017 |
| FBC-R SEC. G2413.4.1, G2413.4.2. |
| |
| 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| CORRUGATED STAINLESS STEEL TUBING |
| |
| (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO |
| FBC SEC.107.2.1. |
| |
| 3. TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| |
| 4. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| G2413.4 (1 ) THROUGH G2413.4 (21). |
| |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2017 |
| FBC-FUEL GAS SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. |
| SEC. G 2413.4.1, G2413.4.2. |
| |
| |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2017 FBC-FUEL GAS SEC.402.1, 402.4.3 |
| THRU 402.6 OR 2017 FBC RES. SEC. G2413.2, G2413.4.3. |
| |