2018-10-03 17:12:24 | 10/03/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING |
| SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING |
| SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING |
| SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS |
| THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH |
| APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH |
| APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF |
| PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE |
| OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. I |
| HAVE PUT AN ISOMETRIC OF EXISTING GAS SYSTEM PLEASE AND |
| TO PLANS AND SHOW YOUR WORK, 2017 FBC FUEL GAS RES. |
| SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3 |
| 2. LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| BTU LOAD ON THE SYSTEM. REFER TO THE 2017 FBC FUEL GAS |
| RES. SEC. G2413. |
| 3. THE SPECIFICATION FOR GENERAC SAYS 281 BTU AT FULL |
| LOAD AND YOU HAVE 330 BTU ON YOUR PLANS, PLEASE CORRECT |
| AND CLARIFY. WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| 4. A LISTED SHUTOFF VALVE SHALL BE INSTALLED |
| IMMEDIATELY AHEAD OF EACH MP REGULATOR. 2017 FBC FBC |
| FUEL GAS RES. SEC. G2420.4. |
| 5. REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING |
| SHALL BE APPROVED FOR OUTDOOR INSTALLATION, PLEASE |
| SUBMIT PAGE 41 AND 42. 2017 FBC FUEL GAS SEC.410.1 OR |
| 2017 FBC FUEL GAS RES. SEC. G2421.1. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 1:00 PM TO 4:00 PM |
| [email protected] |
| 561-805-6720 |
| |