2019-05-14 11:38:05 | 05/14/19 REVISED PROVISO FOR CLARIFICATION. (PER |
| SAMANTHA). |
| |
| BUILDING REVIEW APPROVED WITH PROVISO (SUBMIT |
| INFORMATION PRIOR TO INSPECTIONS TO AVOID |
| CONFLICTS/DELAYS): |
| 1-REVISE PLANS AND RESUBMIT FOR REVIEW. SHOW ATTIC |
| ACCESS SIZE/LOCATION IN ALL ROOF AREAS IN THE 1ST & 2ND |
| FLOOR. |
| 2-SUBMIT PRODUCT APPROVALS FOR REVIEW: A)WINDOW |
| MULLIONS AND SPECIFY MULLION SIZE. B)DOORS PRODUCT |
| APPROVAL FL10765-R6 IS FOR NON-IMPACT DOORS. PROVIDE |
| SHUTTERS PRODUCT APPROVAL AND COMPLETE INSTALLATION |
| SCHEDULE. C)POLYGLASS ROOF UNDERLAYMENT FL5259-R28: |
| CLEARLY MARK WHICH ASSEMBLY L IS GOING TO BE USED. D) |
| SHUTTERS SHOWN ON EXTERIOR ELEVATIONS AND PROVIDE |
| COMPLETE INSTALLATION SCHEDULE. E) WATER PROOFING AT |
| TERRACE. PROVIDE PRODUCT APPROVAL THAT IS DESIGNED TO |
| RECEIVE MATERIAL SPECIFIED BY THE DESIGNER OF RECORD. |
| F) DESIGNER OF RECORD TO REVIEW/APPROVE ALL PRODUCT |
| APPROVALS. |
| 3-SUBMIT COMPLETE INFORMATION FOR ALUMINUM TRELLIS |
| UNDER SEPARATE PERMIT PER ARCHITECT'S RESPONSE LETTER. |
| 4-REVISE PLANS AND RE-SUBMIT FOR REVIEW: ENTRY FOYER |
| FINISH ELEVATION IN ALL PLANS. PER JOHN MELHORN, THE |
| ELEVATION WILL BE 9'-0" (NAVD OF 1988) NOT 8'-6". |
| 5-PER JOHN MELHORN, GARAGE WILL HAVE FLOOD VENTS. |
| PROVIDE PRODUCT APPROVAL AND REVISE PLANS FOR REVIEW |
| SHOWING LOCATION. ALSO, POWDER ROOM LOCATED IN THE |
| GARAGE NEEDS TO BE ELEVATED TO 9'-0". |
| |