Plan Review Notes
Plan Review Notes For Permit 18090651
Permit Number 18090651
Review Stop G
Sequence Number 1
Notes
Date Text
2018-09-18 19:28:3909/18/2018 1ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION, 2017 FBC FUEL GAS RES. SEC. G2421.1.
  
 2. GAS APPLIANCES SHALL BE LISTED AND LABELED, THE
 (FIRE PIT AND COOKTOP). THE INSTALLATION MANUALS FOR
 ALL GAS APPLIANCES/EQUIPMENT SHALL BE ONSITE AT THE
 TIME OF INSPECTION, 2017 FBC FUEL GAS RES. SEC. G2413.2
 AND G2404.3.
  
 3. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2017
 FBC FUEL GAS SEC. 304.1, 614.5 (COOKTOP) OR 2017 FBC
 FUEL GAS RES. SEC. G2407.1 AND G2439.4.
  
 4. A GAS GRILL IS LABELED FOR OUTSIDE USE AND IT SEEMS
 TO BE IN A COVERED PATIO, IF SO PLEASE PROVIDE
 MANUFACTURES RECOMMENDATION FOR A VENTILATION HOOD,
 2017 FBC FG SEC.G2408.1.
  
 5. ON THE TWO COPIES SUBMITTED OF PLANS PLEASE SHOW THE
 DISTANCE OF THE TANKLESS WATER HEATER FROM EACH DOOR OR
 WINDOW THAT THE TABLE FOR INSTALLATION CLEARANCES OF
 THE RINNAI INSTALLATION MANUAL PROVIDES. THE MANUAL
 REQUIRES A CLEARANCE OF EITHER 4 FEET OR 12 INCHES FROM
 ANY OPERABLE WINDOWS OR DOORS PLEASE DRAW IT IN. WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 6. THERE ARE TWO TANKLESS WATER HEATERS, ONE IS 199
 BTU?S AND THERE WAS ONE RINNAI MANUAL SUBMITTED WHICH
 ONLY SHOW DOWN TO 150 BTU?S, IF THERE IS A DIFFERENT
 TANKLESS OF 120 BTU?S PLEASE SUBMIT AND LABEL ON PLANS
 OF WHICH LOCATION IS EACH IN. WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1. INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 7. PLEASE SUBMIT MANUFACTURERS SPECIFICATIONS FOR POOL
 HEATER AND THE MANUFACTURER'S SPECIFICATIONS FOR THE
 POOL HEATER SHALL BE ONSITE FOR FINAL GAS INSPECTION.
 WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 8. PLEASE SUBMIT MANUFACTURERS SPECIFICATIONS FOR
 GENERATOR AND THE MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE
 GENERATOR SHALL BE LISTED AND APPROVED. NFPA 58 SEC.
 5.20.1. THE GENERATOR SHALL MEET THE REQUIREMENTS OF UL
 2200. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 9. THE GENERATOR SHALL BE ONE FOOT SIX INCHES (1?-6?)
 FROM THE HOUSE, FIVE (5?-0?) FROM THE PROPERTY LINE,
 EXHAUST SHALL BE TEN (10?-0?) FROM ANY OPENING UNLESS
 OTHERWISE STATED IN THE MANUFACTURES SPECIFICATION
 INSTRUCTIONS. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved