Plan Review Notes
Plan Review Notes For Permit 18090632
Permit Number 18090632
Review Stop P
Sequence Number 3
Notes
Date Text
2019-01-18 13:25:231) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS.
 WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST.
 2) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37
 PER NFPA 37 SEC. 1.3 & 2017 FBC MECH. SEC. 915. THE
 NARRATIVE STATES THAT THE GENERATOR WILL MEET THE
 REQUIREMENTS OF NFPA 37 BUT DOCUMENTATION HAS NOT BEEN
 PROVIDED TO SUPPORT SUCH STATEMENT. PROVIDE
 DOCUMENTATION FROM THE MANUFACTURER THAT CONFIRMS
 COMPLIANCE. WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST.
 3) INDICATE ON THE PLANS THE CLASS OF LIQUID OF THE
 FUEL IN ACCORDANCE WITH NFPA 30 SEC. 4.3.2. 2ND
 REQUEST.
 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FUEL
 STORAGE TANK. THE STORAGE TANK SHALL MEET THE
 REQUIREMENTS OF NFPA 37 SEC. 22.11.4.1 THROUGH
 SECS.22.11.4.10. SUBMIT A SECTION DETAIL AND PLAN VIEW
 OF THE TANK SHOW THE SIZE OF ALL TANK OPENINGS, VENTS
 AND IDENTIFY EACH OPENING. 2ND REQUEST.
 5) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET
 SHOWS THE DIAMETER OF THE EXHAUST AS 5 INCHES BUT
 SHT.SK-M401-2 SHOWS THE EXXHAUST AS 6 INCH. CLARIFY AND
 SUBMIT A REVISED CALCULATION SHEET.
 6) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET
 NOTES TWO SHORT RADIUS ELBOWS BUT SHT. SK-M401-2
 APPEARS TO SHOW THREE ELBOWS: ONE AT THE GENERATOR, ON
 AT THE HORIZONTAL TURN AND GOING VERTICAL. CLARIFY AND
 SUBMIT A REVISED CALCULATION SHEET.
 7) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF
 NFPA 704 OR ANOTHER APPROVED SYSTEM SHALL BE APPLIED TO
 STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30 SEC.
 21.7.2.1. PLACE A NOTE ON THE PLAN THAT THIS WILL BE
 DONE.
 8) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL
 TANK PER NFPA 30 SEC. 22.7. THIS SHALL INCLUDE THE
 INTERSTITIAL SPACE.REFER TO NFPA 30 SEC. 22.7.3 AND
 TABLE 22.7.3.2. SUBMIT SPECIFICATIONS FOR THE EMERGENCY
 VENT. THIS IS NOT SHOWN ON THE PLAN.
 9) SHOW ON THE PLAN HOW THE VENT PIPES AND FILL PIPE
 WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS OF
 THE STRUCTURE. GROUTING IN PLACE AS NOTED IN THE
 NARRATIVE IS UNACCEPTABLE AND DOES NOT MEET CODE.
 PIPING THAT PASSES THROUGH THE WALL OF A STRUCTURE
 SHALL BE DESIGNED TO PREVENT DAMAGING STRESSES AND
 LEAKAGE DUE TO SETTLEMENT OR FIRE EXPOSURE.NFPA 30
 SEC.27.6.3. 2ND REQUEST.
 10) SUBMIT THE UL APPROVAL/ CERTIFICATE/ CERTIFICATION
 FOR THE FUEL TANK.SECTION 304.1 2017 FBC-MECH. 2ND
 REQUEST.
 11) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL
 COMPLY WITH NFPA 30 SEC.21.4.3.3 NORMAL VENTS SHALL BE
 SIZED IN ACCORDANCE WITH EITHER API STANDARD 2000,
 VENTING ATMOSPHERIC AND LOW-PRESSURE STORAGE TANKS, OR
 ANOTHER APPROVED STANDARD. ALTERNATIVELY, THE NORMAL
 VENT SHALL BE AT LEAST AS LARGE AS THE LARGEST FILLING
 OR WITHDRAWAL CONNECTION, BUT IN NO CASE SHALL IT BE
 LESS THAN 1.25 IN. (32 MM) NOMINAL INSIDE DIAMETER.
 12) THE DOCUMENT FROM EMC ( ENGINEERED MANUFACTURING
 CORP.) IS UNACCEPTABLE. WHO IS CERTIFYING THE TANK?
 THERE IS NO NAME ON THIS DOCUMENT OR THE TITLE OF SUCH
 PERSON. WHO IS THE PERSON AND WHAT IS THEIR RANKING IN
 THE COMPANY? IN ADDITION, THIS DOCUMENT SHOWS THE
 RESULTS OF A LEAKAGE TEST, NOT A UL CERTIFICATION FOR
 THE TANK. THE TANK SHALL BE IN COMPLIANCE WITH UL 2085
 PER THE SPECIFICATIONS ON SHT. E-002.
 13) SHT. E-002 - 2.4 - FUEL OIL STORAGE SPECIFICATIONS
 REFER TO A SUB-BASE TANK BUT THAT IS NOT WHAT IS BEING
 INSTALLED. CLARIFY.
 14) NFPA 30-12 SEC. 22.11.4. - WHERE A SECONDARY
 CONTAINMENT- TYPE TANK IS USED TO PROVIDE SPILL
 CONTROL, THE TANK SHALL MEET ALL OF THE REQUIREMENTS OF
 NFPA 30-12 SECS. 22.11.4.1 THROUGH 22.22.4.10.
 15) IF A NARRRATIVE RESPONSE IS SUBMITTED UPON REVIEW
 OF THESE PLAN REVIEW COMMENTS, THE NARRATIVE SHALL BE
 ON THE LETTERHEAD OF THE ENGINEERING FIRM OF RECORD WHO
 IS ELLIS & GRITTER, NOT STRATICON WHO IS THE
 CONTRACTOR.WPB AMEND TO FBC SEC.107.2.
  
 THE FOLLOWING ITEMS WILL BE PROVISOS AND ARE TO BE
 CHECKED IN THE FIELD BY THE FIELD INSPECTOR:
  
 1) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE
 FUEL RETURN ELEVATION PER NFPA 110SEC.7.9.4.1.
 2) APPROVED FLEXIBLE FUEL LINES SHALL BE USED
 BETWEENTHE PRIME MOVER AND THE FUEL PIPING. NFPA 110
 SEC.7.9.3.2.
  
  
  
  
  
  
  
  
  
  
  
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  