2019-01-18 13:25:23 | 1) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS. |
| WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST. |
| 2) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37 |
| PER NFPA 37 SEC. 1.3 & 2017 FBC MECH. SEC. 915. THE |
| NARRATIVE STATES THAT THE GENERATOR WILL MEET THE |
| REQUIREMENTS OF NFPA 37 BUT DOCUMENTATION HAS NOT BEEN |
| PROVIDED TO SUPPORT SUCH STATEMENT. PROVIDE |
| DOCUMENTATION FROM THE MANUFACTURER THAT CONFIRMS |
| COMPLIANCE. WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST. |
| 3) INDICATE ON THE PLANS THE CLASS OF LIQUID OF THE |
| FUEL IN ACCORDANCE WITH NFPA 30 SEC. 4.3.2. 2ND |
| REQUEST. |
| 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FUEL |
| STORAGE TANK. THE STORAGE TANK SHALL MEET THE |
| REQUIREMENTS OF NFPA 37 SEC. 22.11.4.1 THROUGH |
| SECS.22.11.4.10. SUBMIT A SECTION DETAIL AND PLAN VIEW |
| OF THE TANK SHOW THE SIZE OF ALL TANK OPENINGS, VENTS |
| AND IDENTIFY EACH OPENING. 2ND REQUEST. |
| 5) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET |
| SHOWS THE DIAMETER OF THE EXHAUST AS 5 INCHES BUT |
| SHT.SK-M401-2 SHOWS THE EXXHAUST AS 6 INCH. CLARIFY AND |
| SUBMIT A REVISED CALCULATION SHEET. |
| 6) THE GENERATOR EXHAUST BACKPRESSURE CALCULATION SHEET |
| NOTES TWO SHORT RADIUS ELBOWS BUT SHT. SK-M401-2 |
| APPEARS TO SHOW THREE ELBOWS: ONE AT THE GENERATOR, ON |
| AT THE HORIZONTAL TURN AND GOING VERTICAL. CLARIFY AND |
| SUBMIT A REVISED CALCULATION SHEET. |
| 7) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF |
| NFPA 704 OR ANOTHER APPROVED SYSTEM SHALL BE APPLIED TO |
| STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30 SEC. |
| 21.7.2.1. PLACE A NOTE ON THE PLAN THAT THIS WILL BE |
| DONE. |
| 8) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL |
| TANK PER NFPA 30 SEC. 22.7. THIS SHALL INCLUDE THE |
| INTERSTITIAL SPACE.REFER TO NFPA 30 SEC. 22.7.3 AND |
| TABLE 22.7.3.2. SUBMIT SPECIFICATIONS FOR THE EMERGENCY |
| VENT. THIS IS NOT SHOWN ON THE PLAN. |
| 9) SHOW ON THE PLAN HOW THE VENT PIPES AND FILL PIPE |
| WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS OF |
| THE STRUCTURE. GROUTING IN PLACE AS NOTED IN THE |
| NARRATIVE IS UNACCEPTABLE AND DOES NOT MEET CODE. |
| PIPING THAT PASSES THROUGH THE WALL OF A STRUCTURE |
| SHALL BE DESIGNED TO PREVENT DAMAGING STRESSES AND |
| LEAKAGE DUE TO SETTLEMENT OR FIRE EXPOSURE.NFPA 30 |
| SEC.27.6.3. 2ND REQUEST. |
| 10) SUBMIT THE UL APPROVAL/ CERTIFICATE/ CERTIFICATION |
| FOR THE FUEL TANK.SECTION 304.1 2017 FBC-MECH. 2ND |
| REQUEST. |
| 11) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL |
| COMPLY WITH NFPA 30 SEC.21.4.3.3 NORMAL VENTS SHALL BE |
| SIZED IN ACCORDANCE WITH EITHER API STANDARD 2000, |
| VENTING ATMOSPHERIC AND LOW-PRESSURE STORAGE TANKS, OR |
| ANOTHER APPROVED STANDARD. ALTERNATIVELY, THE NORMAL |
| VENT SHALL BE AT LEAST AS LARGE AS THE LARGEST FILLING |
| OR WITHDRAWAL CONNECTION, BUT IN NO CASE SHALL IT BE |
| LESS THAN 1.25 IN. (32 MM) NOMINAL INSIDE DIAMETER. |
| 12) THE DOCUMENT FROM EMC ( ENGINEERED MANUFACTURING |
| CORP.) IS UNACCEPTABLE. WHO IS CERTIFYING THE TANK? |
| THERE IS NO NAME ON THIS DOCUMENT OR THE TITLE OF SUCH |
| PERSON. WHO IS THE PERSON AND WHAT IS THEIR RANKING IN |
| THE COMPANY? IN ADDITION, THIS DOCUMENT SHOWS THE |
| RESULTS OF A LEAKAGE TEST, NOT A UL CERTIFICATION FOR |
| THE TANK. THE TANK SHALL BE IN COMPLIANCE WITH UL 2085 |
| PER THE SPECIFICATIONS ON SHT. E-002. |
| 13) SHT. E-002 - 2.4 - FUEL OIL STORAGE SPECIFICATIONS |
| REFER TO A SUB-BASE TANK BUT THAT IS NOT WHAT IS BEING |
| INSTALLED. CLARIFY. |
| 14) NFPA 30-12 SEC. 22.11.4. - WHERE A SECONDARY |
| CONTAINMENT- TYPE TANK IS USED TO PROVIDE SPILL |
| CONTROL, THE TANK SHALL MEET ALL OF THE REQUIREMENTS OF |
| NFPA 30-12 SECS. 22.11.4.1 THROUGH 22.22.4.10. |
| 15) IF A NARRRATIVE RESPONSE IS SUBMITTED UPON REVIEW |
| OF THESE PLAN REVIEW COMMENTS, THE NARRATIVE SHALL BE |
| ON THE LETTERHEAD OF THE ENGINEERING FIRM OF RECORD WHO |
| IS ELLIS & GRITTER, NOT STRATICON WHO IS THE |
| CONTRACTOR.WPB AMEND TO FBC SEC.107.2. |
| |
| THE FOLLOWING ITEMS WILL BE PROVISOS AND ARE TO BE |
| CHECKED IN THE FIELD BY THE FIELD INSPECTOR: |
| |
| 1) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE |
| FUEL RETURN ELEVATION PER NFPA 110SEC.7.9.4.1. |
| 2) APPROVED FLEXIBLE FUEL LINES SHALL BE USED |
| BETWEENTHE PRIME MOVER AND THE FUEL PIPING. NFPA 110 |
| SEC.7.9.3.2. |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |