Plan Review Notes
Plan Review Notes For Permit 18090632
Permit Number 18090632
Review Stop P
Sequence Number 2
Notes
Date Text
2018-12-14 11:17:57 
 PLAN REVIEW RESULTS: DENIED.
  
 1) SUBMIT THE GENERATOR EXHAUST PIPE SPECIFICATIONS,
 AND PROVIDE AN EXHAUST PIPE DRAWING SHOWING THE TOTAL
 SYSTEM RUN AND LENGTH MEASUREMENT. PLEASE INCLUDE ALL
 COMPONENTS OF THE SYSTEM INCLUDING THE SILENCER, ANY
 CONTRACTOR SUPPLIED PIPING, AND PIPE SUPPORT AND
 SPACING.
 2) THE GENERATOR SPECIFICATIONS NOTE THAT THE GENERATOR
 OFFERS A UL 2200 LISTING. SUBMIT A COPY OF THE
 CERTIFICATE OF COMPLIANCE SHOWING THE UL 2200 LISTING.
 2017 FBC-MECH. SEC.915.
 3) THE GENERATOR SHALL MEET THE REQUIREMENTS OF NFPA 37
 PER 2017 FBC-MECH. SEC. 915. I COULD NOT FIND THIS
 INFORMATION IN THE SPECIFICATIONS.
 4) SPILL CONTROL, CONTAINMENT AND DRAINAGE MAY BE
 REQUIRED FOR THE FUEL TANK DEPENDING ON THE CLASS OF
 LIQUID OF THE FUEL. NFPA 30 SEC. 9.13. IT APPEARS THE
 FUEL IS A II COMBUSTIBLE LIQUID PER NFPA 30. CLARIF ON
 THE PLANS..
 5) IN ADDITION TO THE TANK PLANS THAT HAVE BEEN
 SUBMITTED, SUPPLY ANY ADDITIONAL MANUFACTURER'S
 SPECIFICATIONS FOR THE FUEL TANK.WPB AMEND. TO FBC SEC.
 107.2.1.
 6) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEMVPER
 THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A
 BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE
 CALCULATION MUST INCLUDE ALL COMPONENTS OF THE EXHAUST
 SYSTEM, INCLUDING THE SILENCER AND ALL FACTORY OR
 CONTRACTOR SUPPLIED PIPING.
 7) THE FUEL TANK VENTS SHALL BE 5 FEET FROM BUILDING
 OPENINGS AND 15 FEET FROM POWERED VENTILATION AIR
 INTAKES PER NFPA 30-12 SEC.19.5.3.2.
 8) A SIGN OR MARKING THAT MEETS THE REQUIREMENTS OF
 NFPA 704, OR ANOTHER APPROVED SYSTEM, SHALL BE APPLIED
 TO STORAGE TANKS CONTAINING LIQUIDS PER NFPA 30
 SEC.21.7.2.1.
 9) EMERGENCY RELIEF VENTING IS REQUIRED FOR THE FUEL
 TANK PER NFPA 30 SEC.22.7.
 10) SHOW ON THE PLAN HOW THE VENT PIPES FROM THE FUEL
 TANK WILL BE PROTECTED WHERE PASSING THROUGH THE WALLS
 OF THE STRUCTURE.
 11) THE FILL PORT FOR THE FUEL TANK SHALL BE PROVIDED
 ON AN EXTERIOR WALL OF THE ROOM OR STRUCTURE ENCLOSING
 THE TANK AT A POINT AT LEAST 24 INCHES FROM ANY
 BUILDING OPENING AT THE SAME OR LOWER LEVEL PER NFPA
 37-15 SEC. 6.6.3.3. SHOW THE LOCATION OF THE FILL PORT
 ON THE PLANS.
 12) THE MAXIMUM BACKPRESSURE FOR THE EXHAUST SYSTEMVPER
 THE MANUFACTURER'S SPECS IS 10 KPA PLEASE PROVIDE A
 BACKPRESSURE CALCULATION TO SHOW COMPLIANCE. THE CALC
 MUST INCLUDE ALL COMPONENTS OF THE EXHAUST SYSTEM,
 INCLUDING THE SILENCER AND ALL FACTORY OR CONTRACTOR
 SUPPLIED PIPING.
 13) PROVIDE THE UL CERTIFICATE FOR THE FUEL TANK-
 SECTION 304.1 FBC M
 14) SUBMIT A FUEL PIPING RISER DIAGRAM. DAY TANKS ON
 DIESEL SYSTEMS SHALL BE INSTALLED BELOW THE ENGINE FUEL
 RETURN ELEVATION PER NFPA 110-13 SEC.7.9.4.
 15) THE RETURN LINE TO THE DAY TANK SHALL BE BELOW THE
 FUEL RETURN ELEVATION PER NFPA 110 SEC. 7.9.4.1.
 16) APPROVED FLEXIBLE FUEL LINES SHALL BE USED BETWEEN
 THE PRIME MOVER AND THE FUEL PIPING. NFPA 110 SEC.
 7.9.3.2.
 17) NORMAL VENTS FROM THE FUEL STORAGE TANK SHALL
 COMPLY WITH.NFPA 30 SEC. 21.4.3.3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  