Date |
Text |
2019-03-23 10:30:05 | PROVISOS: |
| |
| A. SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO |
| INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH |
| PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND |
| ENGINEERING (IF APPLICABLE). |
| |
| B. COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY |
| DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING |
| DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| |
| C. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE LIST |
| SHEET G10.04 ; DOCUMENTS SHOWING COMPLIANCE ARE TO BE |
| REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER |
| SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD |
| APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED |
| ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE |
| REQUIRED PRIOR TO INSTALLATION. |
| |
| D. COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH |
| PRESSURES SHOWN ON SHEET S0.05 AND S0.05A) |
| |
| E. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| REQUIRED FOR: |
| LIGHT POLES/SITE LIGHTING |
| FIRE ALARM |
| FIRE SPRINKLER |
| LOW VOLTAGE |
| ACCESS |
| LANDSCAPING |
| IRRIGATION |
| PARKING LOT |
| ALL OTHER ITEMS OTHER THAN BMEP |
| |
| F. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A |
| PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. |
| |
| G. AIPP COMPLIANCE REQUIRED (VERIFY WITHIN 90 DAYS OF |
| PERMIT ISSUANCE); VERIFICATION REQUIRED PRIOR TO C.O. |
| |
| F. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE |
| SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE |
| ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED |
| PRIOR TO CONCRETE POUR. |
| |
| H. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS |
| REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION. |
| |
| I. CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM |
| SAT-SUN |
| |