Plan Review Notes
Plan Review Notes For Permit 18090469
Permit Number 18090469
Review Stop B
Sequence Number 3
Notes
Date Text
2019-03-23 10:30:05PROVISOS:
  
 A. SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO
 INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH
 PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND
 ENGINEERING (IF APPLICABLE).
  
 B. COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY
 DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING
 DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION.
  
 C. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE LIST
 SHEET G10.04 ; DOCUMENTS SHOWING COMPLIANCE ARE TO BE
 REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL
 (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER
 SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD
 APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED
 ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE
 REQUIRED PRIOR TO INSTALLATION.
  
 D. COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.05 AND S0.05A)
  
 E. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE
 REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 FIRE ALARM
 FIRE SPRINKLER
 LOW VOLTAGE
 ACCESS
 LANDSCAPING
 IRRIGATION
 PARKING LOT
 ALL OTHER ITEMS OTHER THAN BMEP
  
 F. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A
 PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL.
  
 G. AIPP COMPLIANCE REQUIRED (VERIFY WITHIN 90 DAYS OF
 PERMIT ISSUANCE); VERIFICATION REQUIRED PRIOR TO C.O.
  
 F. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE
 SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE
 ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED
 PRIOR TO CONCRETE POUR.
  
 H. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS
 REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION.
  
 I. CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM
 SAT-SUN
  