2018-11-19 10:19:321ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18090469
 360 S. ROSEMARY
 11/19/18
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES
 AND OMISSIONS LISTED BELOW. PLEASE REVIEW ALL COMMENTS,
 INCLUDING THOSE LISTED FOR ADVISORY PURPOSES, AND
 RESUBMIT CORRECTED PLANS AND REQUIRED DOCUMENTS. WHEN
 RESUBMITTING, PLEASE PROVIDE A RESPONSE LETTER
 ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL
 FORM.
 PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL
 CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE
 PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB
 BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL
 INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS
 TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE
 DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL
 FOLLOW ONCE ALL PLANS ARE APPROVED.
  
 1) THE FOLLOWING LIST OF DOCUMENTS WERE NOT SUBMITTED
 BUT ARE REQUIRED IN ORDER TO PERFORM A COMPLETE
 MECHANICAL REVIEW FOR THE PROJECT.
  
 A) SMOKE CONTROL RATIONAL ANALYSIS- SECTION 513.4 FBC
 M: A RATIONAL ANALYSIS SUPPORTING THE TYPES OF SMOKE
 CONTROL SYSTEMS TO BE EMPLOYED, THEIR METHODS OF
 OPERATION, THE SYSTEMS SUPPORTING THEM AND THE METHODS
 OF CONSTRUCTION TO BE UTILIZED SHALL ACCOMPANY THE
 SUBMITTED CONSTRUCTION DOCUMENTS AND SHALL INCLUDE, BUT
 NOT BE LIMITED TO, THE ITEMS INDICATED IN SECTIONS
 513.4.1 THROUGH 513.4.7.
  
 B) AC COOLING AND HEATING CALCULATIONS- SECTION
 C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING,
 VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL
 BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA
 STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED
 EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN
 PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING
 LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS
 THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE
 UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE
 ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN
 APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN
 LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM
 SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING
 IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS
 OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL
 BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL
 PERMIT.
  
 C) ENERGY EFFICIENCY COMPLIANCE REPORT- SECTION C401.2
 FBC EC.
 COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF THE
 FOLLOWING:
 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1,
 EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD.
 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN
 ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH
 SECTION C406 AND TENANT SPACES SHALL COMPLY WITH
 SECTION C406.1.1.
 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404,
 C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING
 ENERGY COST SHALL 'E EQUAL TO OR LESS THAN 85 PERCENT
 OF THE STANDARD REFERENCE DESIGN BUILDING.
 PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA
 BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER
 SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO
 APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER
 SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE.
  
 2) PRODUCT AND ENGINEERING SUBMITTAL DOCUMENTS REQUIRED
 TO PERFORM A COMPLETE MECHANICAL PLAN REVIEW, AND TO
 PERFORM COMPLETE INSPECTIONS ON THE PROJECT.
  
 A) SMOKE CONTROL FANS, DUCTS, FIRE/SMOKE DAMPERS.
  
 B) FIRE DAMPERS
  
 C) MOTORIZED AND BAROMETRIC DAMPERS
  
 D) DUCT SMOKE DETECTORS
  
 E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES
 INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
  
 F) C0, N02, & CO2 SENSORS
  
 G) COOLING TOWERS
  
 H) GENERATOR
  
 I) ACCESS PANELS
  
 J) DUCT FIRE WRAPPING
  
 K) FIRESTOPPING AND FIRE CAULKING
  
 L) CONDENSER WATER PIPING AND PIPE INSULATION.
  
 M) WIND LOAD ENGINEERING FOR THE ROOFTOP MECHANICAL
 EQUIPMENT INCLUDING THE COOLING TOWER, OA UNIT,
 PRESSURIZATION FANS AND CURBS, CONDENSER STANDS AND
 BRACKETS, DUCTS AND DUCT SUPPORTS, HEAT EXCHANGERS,
 PUMPS AND WATER PIPING ETC. PLEASE INCLUDE FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S FOR THE CONDENSER
 STANDS AND MOUNTING BRACKETS.
 PLEASE NOTE: ALL SUBMITTALS AND SHOP DRAWINGS SHALL
 BEAR THE APPROVAL STAMP AND SIGNATURE OF THE DESIGN
 PROFESSIONAL OF RECORD. ALL REQUIRED SUBMITTALS MAY BE
 DEFERRED IN ACCORDANCE WITH SECTION 107.3.4.1 WPB. IT
 WILL BE HELPFUL TO UPLOAD A MASTER LIST OF DEFERRED
 SUBMITTALS IN DOCUMENT FORM, OR IN THE FORM OF NOTES ON
 THE MECHANICAL PLANS.
  
 DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS SECTION,
 DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF
 THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE
  
 3) SUBMITTAL DOCUMENTS REQUIRED FOR FINAL MECHANICAL
 PLAN REVIEW AND INSPECTION APPROVALS, AND CO OF THE
 BUILDING.
  
 A) COMMISSIONING REPORT- COMMISSIONING OF THE
 MECHANICAL SYSTEMS, SERVICE WATER HEATING SYSTEMS, AND
 ELECTRICAL POWER AND LIGHTING SYSTEMS IS REQUIRED PER
 SECTION C408.2 FBC-17 ENERGY CONSERVATION.
 PLEASE NOTE THE FOLLOWING REQUIREMENTS LISTED BELOW.
  
 C408.2. MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER?S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS C408.2.4 AND C408.2.5.
  
 C408.2.1. COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED
 DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL
 ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE
 FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED
 TO, CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN
 CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE'
  
 B) COMMISSIONING OF THE SMOKE CONTROL SYSTEM IS
 REQUIRED IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN
 THE SLS RATIONAL ANALYSIS REPORT. PLEASE REVIEW PAGES
 28-36 OF THE REPORT. IT IS REQUIRED THAT THE SYSTEMS BE
 TESTED BY AN APPROVED SMOKE CONTROL INSPECTOR WHO IS A
 REGISTERED DESIGN PROFESSIONAL AND WHO HAS EXPERTISE IN
 FIRE PROTECTION ENGINEERING AND/OR MECHANICAL
 ENGINEERING.
 PRIOR TO COMMISSIONING THE SMOKE CONTROL SYSTEM,
 DETAILED SMOKE CONTROL TESTING SCENARIOS ARE REQUIRED
 TO BE DEVELOPED BY THE SMOKE CONTROL SPECIAL INSPECTOR
 AS REQUIRED BY SECTION 909.19.8 FBC B, AND ARE REQUIRED
 TO BE REVIEWED BY THE WPB BUILDING AND FIRE
 DEPARTMENTS.
 PAGE 36: A FINAL REPORT SHOULD BE COMPLIED BY THE
 PROJECT'S SMOKE CONTROL SPECIAL INSPECTOR AS REQUIRED
 BY SECTION 909.18.8.3 FBC B. A COPY OF THE REPORT
 SHOULD BE SUBMITTED TO THE WPB BUILDING AND FIRE
 DEPARTMENTS, AND AN IDENTICAL COPY SHOULD BE MAINTAINED
 IN AN APPROVED LOCATION (E.G. THE FIRE COMMAND CENTER)
 IN THE BUILDING.
  
 4) SEPARATE MECHANICAL PERMITS REQUIRED: SEPARATE
 PERMITS ARE REQUIRED FOR KITCHEN EXHAUST HOODS AND FIRE
 SUPPRESSION SYSTEMS, WALK-IN COOLERS AND FREEZERS.
  
 5) PROVIDE MINIMUM VENTILATION CALCULATIONS FOR ALL
 ROOMS AND SPACES PER TABLE 403.3.1.1 FBC-17 MECHANICAL.
 PROVIDE A SCHEDULE THAT INDICATES THE REQUIRED AND
 PROVIDED CFMS OF OUTDOOR AIR. IT APPEARS THAT THE
 REQUIRED CALCULATIONS WERE TO BE PLACED ON THE BLANK
 SHEET M8.03 WHICH BEARS A SMALL NOTE REFERENCING THE
 CALCULATIONS.
  
 6) SHEET M1.1: THERE ARE NO AC SYSTEMS PROVIDED FOR THE
 RETAIL AREAS. PLEASE LABEL THESE AREAS AS "FUTURE" IF
 APPLICABLE, AND NOTE THAT ALL INTERIOR SPACES INTENDED
 FOR HUMAN OCCUPANCY SHALL BE PROVIDED WITH ACTIVE OR
 PASSIVE SPACE-HEATING SYSTEMS- SECTION 309.1 FBC-M.
  
 7) M1.1: NO VENTILATION AIR (O/A) PROVIDED TO THE
 ELEVATOR LOBBIES, CORRIDOR, FIRE RESCUE, FIRE COMMAND
 AND OTHER OCCUPIED ROOMS AND SPACES- SEE SECTIONS
 401.2, 402.1, 403.1, 403.2 AND TABLE 403.3.1.1 FBC M.
 O/A. HOW WILL POSITIVE PRESSURE ME MAINTAINED IN THESE
 AREAS THAT ARE ADJACENT TO THE GARAGE AREA WHERE
 EXHAUST IS REQUIRED?
  
 8) PROVIDE EXHAUST VENTILATION CALCULATIONS AND THE
 SEQUENCE OF OPERATION FOR THE
 A) ENCLOSED GARAGE/LOADING DOCK AREA.
 B) DIESEL TANK ROOM.
 C) FIRE PUMP ROOM.
 D) SHOP.
 E) RESTROOM
 F) SMOKE PURGE SYSTEMS.
  
 9) M1.1: THE EXHAUST SYSTEMS FOR THE FIRE PUMP ROOM,
 SHOP, AND RESTROOM SHALL DISCHARGE TO THE OUTDOORS AND
 NOT THE INTERIOR GARAGE AREA- SECTION 501.3.
  
 10) M1.1: AUTOMATIC SHUT OFF DAMPERS EITHER MOTORIZED
 OR GRAVITY-TYPE ARE REQUIRED ON ALL O/A INTAKES AND
 EXHAUST OPENINGS- SECTION C403.2.4.3 FBC EC.
  
 11) M1.1: THE MAKEUP AIR OPENING AT THE DIESEL TANK
 ROOM/GARAGE WALL IS NOT PERMITTED. ALL AIR FROM THE
 GARAGE SHALL BE EXHAUSTED AND NOT TRANSFERRED OR
 RECIRCULATED INTO ADJACENT SPACES- TABLE 403.3.1.1.
 FOOTNOTE B.
  
 12) M1.1: THE LOCATION OF OPEN AIR INTAKE (TIL-1-1) BY
 THE DRIVE AREA IS NOT IN COMPLIANCE WITH SECTION 401.4
 (2) FBC M.
  
 13) M1.1: THE "EXIT PASSAGEWAY" OR "STAIRWAY EXTENSION"
 FROM STAIR #1 IS MISLABELED AS AN "EGRESS CORRIDOR".
 PLEASE SEE SECTION 202 DEFINITIONS, AND SECTION 1023
 1024 FBC B. PLEASE NOTE THAT THIS PASSAGE WAY OR
 EXTENSION IS ALSO CLASSIFIED AS A SMOKEPROOF ENCLOSURE
 AND SHALL BE PRESSURIZED EQUALLY TO THE PRESSURIZATION
 REQUIRED FOR THE STAIRWAY DURING AN EMERGENCY ALARM
 EVENT- SEE SECTION 1023.11.1 FBC B.
  
 14) M1.1: THE CONDENSING UNITS (CU'S) SHOWN IN THE
 INTERIOR GARAGE AREA ARE DESIGNED TO BE INSTALLED IN
 ACCORDANCE WITH THE CONDITIONS OF THEIR LISTING AND THE
 MANUFACTURER'S INSTALLATION INSTRUCTIONS- SECTION 304.1
 FBC M. TYPICALLY THESE UNITS MUST BE INSTALLED
 OUTDOORS.
  
 15) M1.1: AS NOTED ABOVE IN COMMENT #8, THERE IS NO
 SEQUENCE OF OPERATION FOR THE EXHAUST SYSTEM IN THE
 GARAGE AREA. PLEASE REFER TO SECTIONS 404.1 & 404.2 FBC
 M AND PROVIDE A NARRATIVE TO CLARIFY HOW THIS SYSTEM
 WILL FUNCTION, AND SUBMIT MANUFACTURER'S SPECIFICATIONS
 AND INSTALLATION INSTRUCTIONS FOR THE CO AND NO2
 SENSORS- SEE COMMENT #2 ABOVE.
  
 16) M1.1 GENERATOR/DIESEL TANK: A) SUBMIT
 MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR AND
 DIESEL TANK, FUEL AND VENT PIPES, MUFFLER, AND ALL
 OTHER ASSOCIATED SYSTEM COMPONENTS. B) SUBMIT A COPY OF
 THE UL CERTIFICATE OF COMPLIANCE FOR THE GENERATOR
 INDICATING THE UNIT MEETS THE REQUIREMENTS OF UL 2200.
 C) SHOW THE TERMINATION LOCATION OF THE ENGINE EXHAUST
 VENT PIPE. D) SHOW THE FUEL PIPING RUN FROM THE TANK TO
 THE GENERATOR AND INDICATE HOW THE PIPE PENETRATION
 WILL BE FIRESTOPPED. E) PLEASE REVIEW SECTION 7.7.1
 NFPA 110. AN AC SYSTEM MAY BE REQUIRED FOR THE
 GENERATOR ROOM IN ORDER TO LIMIT THE MAXIMUM AIR
 TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR
 TEMPERATURE AS REQUIRED BY THE GENERATOR MANUFACTURER.
  
 17) M1.1: INDICATE THE CLEARANCE DISTANCE BETWEEN THE
 GENERATOR ROOM INTAKE AND EXHAUST LOUVERS- SECTIONS
 401.4 AND 501.3.1 FBC M.
  
 18) M1.1: INDICATE THE CLEARANCE DISTANCE HEIGHT OF THE
 PFSP-1 & 2, AND EF-1-5 EXHAUST OUTLETS TO THE ADJOINING
 GRADE- SECTION 501.3.1 (2) FBC M.
  
 19) M1.1: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE
 AIR HANDLERS- SECTION 307.2 FBC M. PLEASE NOTE THAT NO
 PIPE SIZES OR PIPE DETAILS ARE PROVIDED ON THE RISER
 DRAWING- SHEET M4.01.
  
 20) LS1.01: THE LIFE SAFETY PLAN SHOWS AN INTERSTITIAL
 SPACE WHERE STAIR #2 IS EXTENDED VIA AN EXIT PASSAGEWAY
 TO STAIR #6. PLEASE NOTE THAT THERE ARE NO MECHANICAL
 PLANS UPLOADED FOR THIS SPACE, AND THE EXIT PASSAGEWAY
 IS MISLABELED AS AN EGRESS CORRIDOR. THE PASSAGEWAY AND
 STAIR #6 ARE ALSO SMOKEPROOF ENCLOSURES THAT NEED TO BE
 PRESSURIZED DURING AN EMERGENCY ALARM- SEE COMMENTS #1A
 & #13 ABOVE AND CORRECT THE RISER DRAWINGS ON SHEET
 M6.01.
  
 21) M1.1: PROVIDE SIZING CALCULATIONS FOR THE SMOKE
 PURGE SYSTEMS- SECTION 403.4.7 FBC B.
  
 22) M1.2, 1.3, 1.4, 1.5, 1.6, 1.7, & M1.8: THE NOTES ON
 THE PLAN INDICATE THE DESIGN PROFESSIONALS HAVE NOT
 DECIDED WHETHER THE GARAGE IS DESIGNED AS "OPEN" OR
 "ENCLOSED", BUT HAVE STATED THAT THE CURRENT DESIGN
 WILL NOT WORK FOR ENCLOSED GARAGES? PLEASE CLARIFY THAT
 STATEMENT AND NOTE THAT ENCLOSED GARAGES SHALL HAVE
 MECHANICAL EXHAUST VENTILATION SYSTEMS DESIGNED IN
 ACCORDANCE WITH SECTION 404 FBC M. THE CURRENT PLAN
 SHOWS THE GARAGE EXHAUST FANS LOCATED IN ONE REMOTE
 CORNER OF THE GARAGE WHICH MAY LIMIT THEIR ABILITIES TO
 EXHAUST THE ENTIRE AREA OF THE GARAGES- PLEASE SEE
 SECTION 502.1.1 FBC M. A) THE EXHAUST FAN SCHEDULE FOR
 THE GARAGES ON M8.02 SHOWS THE FANS INTERLOCKED WITH
 CO/NO2 SENSORS. PLEASE SHOW THE SENSOR LOCATIONS ON THE
 PLAN AND PROVIDE A SEQUENCE OF OPERATION. B) PROVIDE
 EXHAUST VENTILATION CALCULATIONS FOR EACH GARAGE- TABLE
 403.3.1.1 FBC M.
  
 23) LS1.02, 1.03, 1.04, 1.05, 1.06, 1.07, 1.08, 1.09 &
 LS1.10: INTERIOR EXIT STAIRWAY ENCLOSURES (STAIR #1 &
 #2) SHALL HAVE 2-HR. FIRE-RATED WALLS, HOWEVER THE
 DRAWINGS APPEAR TO INDICATE A SMALL SECTION OF THE
 ENCLOSURE IS ONLY 1-HR. RATED AT THE LOCATIONS OF THE
 PRESSURIZATION DUCT SHAFTS. PLEASE REVIEW SECTION 1023
 FBC B.
  
 24) M1.2, 1.3, 1.4, 1.5, 1.6, 1.7, M1.8: A) NO
 VENTILATION AIR PROVIDED TO OCCUPIED ROOMS- SECTION
 401.2 B) THE EXHAUST FROM EF-2 SHALL DISCHARGE TO THE
 OUTDOORS- SECTION 501.3 FBC M. C) NO VENTILATION OR
 SPACE HEATING PROVIDED TO THE OFFICES ON THE SOUTH AND
 WEST SIDES OF THE BUILDING DESPITE NOTES ON THE M1.02 &
 M1.04 PLANS REFERENCING EQUIPMENT- SECTIONS 309.1 &
 401.2 FBC M. IT APPEARS THESE AREAS ARE SHELL SPACES TO
 BE BUILT OUT AT A FUTURE DATE. PLEASE PLACE NOTES ON
 THE PLANS TO CLARIFY, AND SHOW HOW O/A WILL BE
 PROVIDED.
  
 25) M1.09: NO VENTILATION OR SPACE HEATING PROVIDED TO
 THE OFFICES- SECTIONS 309.1 & 401.2 FBC M. IT APPEARS
 THESE AREAS ARE SHELL SPACES TO BE BUILT OUT AT A
 FUTURE DATE. PLEASE PLACE NOTES ON THE PLANS TO
 CLARIFY.
  
 26) M2.01: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 SUPPLY SYSTEM OF AC-9-1- SECTION 606.2.1 FBC M.
  
 27) M2.02: INDICATE WHICH FLOORS THIS "TYPICAL" DRAWING
 PERTAINS TO AND WHICH AC SYSTEMS. SHOW THE LOCATION OF
 THE REQUIRED DUCT SMOKE DETECTOR- SECTION 606.2.1 FBC
 M.
  
 28) M2.03 & M.401: A) PROVIDE THE CONDENSATE PIPE SIZES
 IN THE RISER DRAWING. B) INDICATE WHERE THE CONDENSATE
 BRANCH PIPES ARE DISCHARGING TO, OR HOW THEY ARE ALL
 CONNECTING INTO A MAIN STORM DRAIN. C) THE NOTE ON
 M.401 REFERENCES RISER CONTINUATIONS ON M.203. PLEASE
 NOTE THESE CONTINUATIONS ON M.203.
  
 29) M.601: PLEASE CORRECT STAIR #1 & 2 PRESSURIZATION
 RISERS IN ACCORDANCE WITH COMMENTS #1A, 13 & 20.
  
 30) PROVIDE A REFRIGERANT RISER DRAWING FOR THE DX
 SYSTEMS- SECTION 304.1 FBC M.
  
 31) PROVIDE WIND LOAD ENGINEERING FOR INSTALLATION OF
 ALL ROOFTOP MECHANICAL EQUIPMENT- SECTION 301.15 FBC M.
 THIS INFORMATION CAN BE PROVIDED WITH THE CORRECTED
 PLANS, OR AS A DEFERRED SUBMITTAL- SEE COMMENT #2.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved