Text |
2018-10-25 09:39:49 | 1) THE SUBMITTED GAS DRAWING SHOWS THE BTU LOAD OF THE |
| GENERATOR AS 330,000 BTU'S BUT THE GENERATOR SPECS SHOW |
| THE FULL BTU LOAD AS 281,000 BTU'S. CLARIFY. |
| 2) TWO DIFFERENT GAS DRAWINGS ARE SUBMITTED IN THIS |
| APPLICATION PACKAGE. REMOVE ALL OLDD DOCUMENTS AND |
| SUBMIT TWO COMPLETE SETS OF PLANS THAT CLEARLY REFLECST |
| THE SCOPE OF WORK TO BE DONE. FBC 107.2.1. |
| 3) THERE IS A SHEET FROM ONE STOP GENERATOR SHOP THAT |
| STATES THE GENERATOR WILL BE CONNECTING TO AN EXISTING |
| GAS LINE BUT A GAS DRAWING HAS BEEN SUBMITTED THAT |
| SHOWS A NEW GAS METER FOR THE GENERATOR. CLARIFY. AT |
| THIS POINT I HAVE NO IDEA AS TO WHAT IS BEING INSTALLED |
| AT THIS SITE. |
| 4) THERE ARE TWO SURVEYS IN THIS PERMIT APPLICATION |
| PACKAGE THAT SHOW TWO DIFFERENT LOCATIONS FOR THE |
| GENERATOR AND A THIRD PLAN THAT SHOWS AN ALTOGETHER |
| DIFFERENT LOCATION FOR THE GENERATOR. SUBMIT TWO COPIES |
| OF A LEGIBLE SURVEY THAT CLEARLY SHOWS THE LOCATION OF |
| THE GENERATOR AND THE GAS METER(S). REMOVE ALL OLD |
| OCCUMENTS FROM THE PERMIT PACKAGE. |
| 5) SUBMIT MANUFACTURER?S SPECIFICATIONS AND |
| INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. |
| REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING |
| SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON |
| THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING |
| INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR |
| CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017 |
| FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. |
| 6) THE LOCATION OF THE GENERATOR IN RELATION TO |
| BUILDING OPENINGS AND OPERABLE DOORS AND WINDOWS SHALL |
| COMPLY WITH THE MANUFACTURER'S INSTALLATION MANUAL. THE |
| STANDARD DISTANCE IS 10 FT.BUT THE MANUAL SHALL BE |
| FOLLOWED. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |