2018-10-04 12:54:52 | THE FOLLOWING ITEMS ARE PROVISOS AND MUST BE ADDRESSED |
| BEFORE ANY FINAL INSPECTIONS ARE SCHEDULED FOR ANY OF |
| THESE SYSTEMS. |
| |
| SUBMIT A DETAIL OF THE CONDENSATE DRYWELL FOR REVIEW. |
| 2017 FBC SEC. 107.2.1. |
| SHT. P-102 - SHOW THE SQUARE FOOT AREA OF THE ROOF OF |
| THE PORTE COCHERES BEING DRAINED. INCLUDE ONE-HALF OF |
| THE AREA OF ANY PARAPET WALLS. 2017 FPC SEC.1106.4. |
| SUBMIT SPECIFICATIONS FOR THE COMBO ROOF DRAINS. |
| SHT. P-101. CLOUD AND IDENTIFY THE CHANGES MADE TO THE |
| PLUMBING SYSTEM. CURRENTLY, THERE ARE NO CHANGES SHOWN |
| ON THIS SHEET. CLARIFY. |
| SUBMIT REVISED PIPING RISERS FOR THE SANITARY, STORM, |
| AND CONDENSATE SYSTEMS THAT CLEARLY REFLECT ALL THE |
| CHANGES MADE TO THESE SYSTEMS. SHOW THE LINT TRAP ON |
| THE RISER AND SUBMIT A DETAIL OF THE LINT TRAP. FBC |
| 107.2.1. |
| SUBMIT A REVISED GAS RISER WITH THE CORRECT PIPE |
| SIZING. |
| |
| SPECIFICATION SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE |
| WITH STANDARDS NFPA 54, NFPA 58, AND |
| FBC-2014 FUEL GAS SEC. 301.3. |
| |
| LOCATION, LENGTH, SIZE AND |
| TERMINATION OF THE GAS VENTS PER |
| FBC-2014 FUEL GAS CODE SEC. 502 THRU |
| 504. SUBMIT CALCULATIONS FOR |
| COMBUSTION AIR PER THE FBC-2014 |
| FUEL GAS CODE SEC. 304. FOR BOILERS |
| |
| COMBUSTION AIR PER THE FBC-2014 |
| FUEL GAS CODE SEC. 304. FOR BOILER |
| AND DRYERS |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |