Date |
Text |
2018-08-27 15:42:55 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| 1) THERE ARE NO INDICATIONS OF WORK OR STATUS ON THE |
| LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE SPRINKLERS. |
| |
| THE LIFE SAFETY SYSTEMS SHALL BE MAINTAINED AT ALL |
| TIMES DURING CONSTRUCTION. |
| |
| PLEASE PROVIDE AND APPLICABLE NOTE OF ACKNOWLEDGEMENT |
| AND COMPLIANCE. |
| |
| |
| |
| 2) ANY WORK ON THE LIFE SAFETY SYSTEMS SHALL BE UNDER |
| SEPARATE SHOP DAWINGS BY CERTIFIED LIFE SAFETY |
| CONTRACTORS. |
| |
| PER NFPA 1 |
| |
| 1.14.5 WHEN REQUIRED BY THE AHJ, REVISED CONSTRUCTION |
| DOCUMENTS OR SHOP DRAWINGS SHALL BE PREPARED AND |
| SUBMITTED FOR |
| REVIEW AND APPROVAL TO ILLUSTRATE CORRECTIONS OR |
| MODIFICATIONS |
| NECESSITATED BY FIELD CONDITIONS OR OTHER REVISIONS TO |
| APPROVED |
| PLANS. |
| |
| PLEASE PROVIDE AND APPLICABLE NOTE OF ACKNOWLEDGEMENT |
| AND COMPLIANCE. |
| |
| |
| |
| 3) SHEET EP 300 - THERE ARE NO INDICATION OF SMOKE |
| DETECTION/ALARMS IN THE AFFECTED BEDROOM AND/OR |
| HALLWAY. |
| |
| PER NFPA 101 |
| |
| 31.3.4.5 SMOKE ALARMS. |
| 31.3.4.5.1* IN BUILDINGS OTHER THAN THOSE EQUIPPED |
| THROUGHOUT WITH AN |
| EXISTING, COMPLETE AUTOMATIC SMOKE DETECTION SYSTEM, |
| SMOKE ALARMS |
| SHALL BE INSTALLED IN ACCORDANCE WITH 9.6.2.10, AS |
| MODIFIED BY 31.3.4.5.2, |
| OUTSIDE EVERY SLEEPING AREA IN THE IMMEDIATE VICINITY |
| OF THE BEDROOMS |
| AND ON ALL LEVELS OF THE DWELLING UNIT, INCLUDING |
| BASEMENTS. |
| 31.3.4.5.2 SMOKE ALARMS REQUIRED BY 31.3.4.5.1 SHALL |
| NOT BE REQUIRED TO |
| BE PROVIDED WITH A SECONDARY (STANDBY) POWER SOURCE. |
| |
| PLEASE PROVIDE APPLICABLE DETAILS. |
| |
| |
| |
| 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| |
| 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |