2019-02-06 17:38:40 | 3RD REVIEW FBC-2017 MECHANICAL |
| PERMIT #18081039 |
| 2/7/19 |
| |
| CODES IN EFFECT: |
| |
| FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| 2017 |
| FBC R- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017 |
| FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| FS- FLORIDA STATUTES |
| FAC- FLORIDA ADMINISTRATIVE CODE |
| WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| EDITION 2017 |
| GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE |
| FACILITIES |
| ASHRAE 170-2008. |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) COMCHECK ENERGY COMPLIANCE RESUBMITTED REPORT: |
| |
| A) THE BTUH COOLING CAPACITIES FOR AHU- 1& 2 AND THE |
| DOAS- 1 & 2 DO NOT MATCH THE CAPACITIES SHOWN IN TH |
| SCHEDULE ON SHEET M-701. |
| B) REFERENCE IS MADE TO IPLV RATINGS CH-1 & 2 THAT ARE |
| NOT SHOWN IN THE SCHEDULES- SEE TABLE C403.2.3(7) FBC |
| EC. |
| C) COOLING AND HEATING CAPACITIES FOR FCU 1-7, 1-8, & |
| 1-9 ARE REVERSED. |
| D) HEATING CAPACITIES FOR MANY OF THE FCU'S DO NOT |
| MATCH THE CAPACITIES IN THE SCHEDULE. |
| |
| 2) SHEET M-703: THE VENTILATION CALCULATIONS FOR (OR'S |
| # 442, 443, 444, & 445), & (ROOMS 451,453, 457, 458) |
| AND THE FOURTH FLOOR POST-OP AND PRE-OP ROOMS ARE NOT |
| SHOWN IN THE SCHEDULE. AS PREVIOUSLY NOTED THE SCHEDULE |
| IS NOT IN COMPLIANCE WITH TABLE 7-1 ASHRAE-170 WHICH |
| REQUIRES MINIMUM OUTDOOR AIR CHANGES AND MINIMUM TOTAL |
| SUIPPLY AIR CHANGES AND PRESSURE RELATIONSHIPS TO BE |
| SHOWN FOR ALL ROOMS AND SPACES. ALSO IT IS NOT CLEAR |
| HOW THE PRESSURE RELATIONSHIPS WILL BE MONITORED. WILL |
| SENSORS BE INSTALLED? |
| |
| 3) M-201: THE SUBMITTED SPECIFICATIONS FOR THE CUMMINGS |
| EMERGENCY GENERATOR INDICATE THE UNIT IS A LEVEL 2 |
| SYSTEM , HOWEVER THE AMBULATORY SURGICAL CENTER |
| REQUIRES A LEVEL 1 SYSTEM- SEE SECTION 451.3.13 FBC B |
| AND SECTIONS 4.4.1 & NFPA 110. THE GENERATOR SHALL ALSO |
| BE UL 2200 LISTED AND LABELED, AND IN COMPLIANCE WITH |
| NFPA 37- SECTION 915.1 FBC M. |
| |
| 4) M-201: COMMENT #5 FROM THE PREVIOUS REVIEW STILL |
| EXISTS : THE REQUESTED MANUFACTURER'S SPECIFICATIONS |
| FOR THE GENERATOR AND ASSOCIATED EQUIPMENT INCLUDING |
| THE VENT PIPING WERE NOT SUBMITTED. THE EXHAUST FLUE |
| TERMINATION REQUIRED CLEARANCE MEASUREMENTS NOT |
| PROVIDED ON THE PLAN. |
| A) PROVIDE AN EXHAUST FLUE DIAGRAM THAT INCLUDES THE |
| TOTAL RUN LENGTH, AND INDICATE HOW THE PIPE WILL BE |
| SUPPORTED. |
| B) VERIFY THE EXHAUST SYSTEM INCLUDING SILENCER COMPLY |
| WITH THE GENERATOR ENGINE'S MAX BACKPRESSURE- PLEASE |
| PROVIDE A CALCULATION. |
| C) CLARIFY HOW THE RADIATOR EXHAUST AT THE TOP OF THE |
| GENERATOR WILL BE VENTED TO THE OUTDOORS.THE GENERATOR |
| ROOM IS ONLY OPEN ON ONE SIDE AND MAY BE SUBJECT TO |
| POSITIVE PRESSURE WHICH WOULD TRAP THE EXHAUST IN THE |
| ROOM. PLEAS NOTE THAT SECTION 7.7.4.2 NFPA 110 REQUIRES |
| THE RADIATOR DISCHARGE TO BE DUCTED OUTDOORS OR TO AN |
| EXTERIOR OPENING BY A 2-HOUR FIRE RATED AIR TRANSFER |
| SYSTEM. |
| D) SHOW ALL REQUIRED VENT PIPING RUNS, AND TERMINATION |
| LOCATIONS. INDICATE THE TYPE AND SIZE OF THE PIPING. |
| |
| 5) A-001 & M-201: REFER TO SECTION 7.2.1.1: THE EPS |
| (GENERATOR) ROOM SHALL BE SEPARATED FROM THE REST OF |
| THE BUILDING BY 2-HR FIRE RESISTANCE RATED |
| CONSTRUCTION. THE PLANS ARE INDICATING 1-HR FIRE RATED |
| WALLS ENCLOSING THE ROOM. PLEASE NOTE THE FLOOR/CEILING |
| ASSEMBLY ABOVE THE ROOM MUSTL ALSO BE 2-HR. FIRE-RATED |
| - PLEASE CORRECT THE PLANS. |
| |
| 6) M-201: REFER TO SECTIONS 7.7.1 & 7.7.7 NFPA 110 AND |
| PROVIDE VERIFICATION FROM THE GENERATOR MANUFACTURER |
| THAT THE VENTILATION SYSTEM, AS CURRENTLY DESIGNED, |
| WILL LIMIT THE MAXIMUM AMBIENT AIR TEMPERATURE IN THE |
| ENCLOSURE TO THE MAXIMUM AIR TEMNPERATURE REQUIRED BY |
| THE MANUFACTURER. |
| |
| 7) REFER TO SECTION 451.3.13.1 FBC B AND PROVIDE A |
| NARRATIVE THAT VERIFIES THAT A TYPE 1 ESSENTIAL |
| ELECTRICAL SYSTEM HAS BEEN PROVIDED FOR THE FACILITY AS |
| DESCRIBED BY NFPA 99 |
| |
| 8) M-201 & M-703: THE ARE NO EXHAUST AIR FLOW CHANGES |
| SHOWN IN THE SCHEDULE FOR THE FUTURE MRI ROOMS, HOWEVER |
| EXHAUST IS SHOWN ON THE PLAN. |
| |
| 9) M-201: PLEASE CLARIFY IF THE LOCATION OF THE |
| CRYOGENIC EXHAUST DUCT TERMINATION IS LOCATED IN A |
| VENTILATED SOFFIT, AND INDICATE THE TYPE AND SIZE OF |
| EXHAUST DUCT MATERIAL- SECTIONS 510.9 FBC M. |
| |
| 10) M-201: THE EXHAUST DUCT FROM THE MEDGAS ROOM SHALL |
| BE ENCLOSED IN 2-HR FIRE-RATED CONSTRUCTION IN |
| ACCORDANCE WITH SECTION 510.7.3 FBC M. A) PLEASE |
| PROVIDE DETAILS AND PROTECTION FOR THE EF-4 OPENING |
| FROM WIND PRESSURE AND WIND BORNE DEBRIS- SECTION |
| 301.15 FBC M. B) INDICTE THE TYPE OF DUCTWORK TO BE |
| INSTALLED- SECTION 510.9 FBC M. |
| |
| 11) M-201: IT APPEARS THAT THE EF-4 EXHAUST OUTLET IS |
| LESS THAN THE 10' REQUIRED CLEARANCE DISTANCE TO THE |
| DOOR OPENING- SECTION 501.3.1 (2) FBC M. A) THE GARAGE |
| EXHAUST DUCT ALSO APPEARS TO BE WITHIN THE REQUIRED 3' |
| CLEARANCE PER 501.3.1 (3). |
| |
| 12) M-201: INDICATE HOW MAKEUP AIR IS BEING PROVIDED |
| FOR THE MEDGAS ROOM EXHAUST, AND PROVIDE A SEQUENCE OF |
| OPERATION FOR THE FAN- SEE SECTION 510.6.5 FBC M AND |
| 60.3.2.5.3 FFPC- 2017. A) CLARIFY HOW EF-4 WAS SIZED |
| AND PROVIDE AN EXHAUST VENTILATION CALCULATION. |
| |
| 13) M-201: RETURN AIR CANNOT BE TAKEN FROM THE MEP ROOM |
| 101- SECTION 601.5 (7) FBC M. |
| |
| 14) M-201, 202, 203: PROVIDE DETAILS OR NOTES ON THE |
| PLAN TO VERIFY COMPLIANCE WITH ONE OF THE THREE |
| EXCEPTIONS FOR REQUIRED DUCT SMOKE DETECTORS LISTED |
| UNDER SECTION 606.2.2: COMMON SUPPLY SYSTEMS. |
| WHERE MULTIPLE AIR-HANDLING SYSTEMS SHARE COMMON SUPPLY |
| WITH A COMBINED DESIGN CAPACITY GREATER THAN 2,000 CFM |
| (0.9 M3/S), EACH SUPPLY AIR SYSTEM SHALL BE PROVIDED |
| WITH SMOKE DETECTORS IN ACCORDANCE WITH SECTION |
| 606.2.1. |
| |
| EXCEPTION: INDIVIDUAL SMOKE DETECTORS SHALL NOT BE |
| REQUIRED FOR EACH FAN-POWERED TERMINAL UNIT, PROVIDED |
| THAT SUCH UNITS DO NOT HAVE AN INDIVIDUAL DESIGN |
| CAPACITY GREATER THAN 2,000 CFM (0.9 M3/S) AND WILL BE |
| SHUT DOWN BY ACTIVATION OF ONE OF THE FOLLOWING: |
| 1.SMOKE DETECTORS REQUIRED BY SECTIONS 606.2.1 AND |
| 606.2.3. |
| 2.AN APPROVED AREA SMOKE DETECTOR SYSTEM LOCATED IN THE |
| RETURN AIR PLENUM SERVING SUCH UNITS. |
| 3.AN AREA SMOKE DETECTOR SYSTEM AS PRESCRIBED IN THE |
| EXCEPTION TO SECTION 606.2.1. |
| |
| 15) M-201 ENCLOSED GARAGE: |
| A) SHOW THE LOCATIONS OF THE CO/NO2 SENSORS. |
| B) PROVIDE AN EXHAUST VENTILATION CALCULATION TO VERIFY |
| FAN SIZING- SECTION 404.2 FBC M. |
| C) THE SPECS FOR THE SENSORS DO NOT INDICATE THE |
| SENSORS ARE LISTED OR HAVE BEEN TESTED IN ACCORDANCE |
| WITH ANY STANDARD- SECTION 304.1 FBC M. D) REFER TO |
| SECTION 502.1.1: |
| D) IT DOES NOT APPEAR THAT THE LOCATION OF THAT THE |
| LOCATION OF THE GARAGE EXHAUST INLET (R3) IS LOCATED IN |
| THE AREA OF THE HEAVIEST CONCENTRATION OF CONTAMINANTS. |
| E) PROVIDE SUPPORT AND HANGING DETAILS FOR RF-4 AND |
| DUCTWORK, AND SHOW THE CLEARANCE HEIGHTS FOR THE FAN |
| AND DUCTWORK FROM THE FINISHED GARAGE FLOOR- SECTION |
| 304.6 FBC M. |
| F) PLEASE LABEL R3 AND RF-4 USING THE "E" SYMBOL FOR |
| EXHAUST- SECTION 107.2.1 WPB. |
| |
| 16) REPEAT COMMENT #11 FROM THE 1ST REVIEW: M-204: |
| PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY SYSTEMS OF |
| AHU- 1 & 2, AND DOAS- 1 & 2 PER SECTION 606.2.1 FBC M. |
| A) PLEASE REFER TO SECTIONS 606.4 AND 606.4.1 FBC M AND |
| PROVIDE FAN SHUTDOWN SEQUENCES. ( IN REPONSE TO THIIS |
| COMMENT, THE ENGINEER INDICATES IN THE NARRATIVE THAT |
| THE DETECTORS ARE ON ELECTRICAL PLAN SHEETS, HOWEVER |
| THIS IS A MECHANICAL CODE REQUIRMENT AND THEY MUST BE |
| SHOWN ON THE MECHANICAL PLANS FOR PLAN REVIEW |
| COMPLIANCE, AND TO AVOID CONFLICTS IN THE FIELD). |
| |
| 17) THE ENGINEER IS INDICATING IN THE COMMENT RESPONSE |
| NARRATIVE THAT THE REQUESTED WIND LOAD ENGINEERING FOR |
| THE ROOFTOP AND OTHER EXTERIOR MECHANICAL EQUIPMENT IS |
| PROVIDED BY THE MANUFACTURER AND THE NOA'S. A) THE |
| SUBMITTED NOA FOR THE DOAS IS MISSING THE INSTALLATION |
| PAGES. B) NO ENGINEERING HAS BEEN PROVIDED BY THE |
| MANUFACTURER'S OF THE AIR HANDLERS, THE CHILLERS, THE |
| FANS, ROOFTOP DUCTWORK AND SUPPORTS ETC. PLEASE NOTE |
| THAT SITE SPECIFIC ENGINEERING IS REQUIRED PER SECTION |
| 301.15 FBC M, AND 1609 FBC B. |
| |
| 18) M-701 & M-703: AN ERV IS REQUIRED DUE TO THE FACT |
| THAT EF-1 HAS AN EXHAUST RATE OF 7600 CFMS WHICH |
| EXCEEDS THE 4597 CFM SUPPLY AIRFLOW RATE- SEE SECTION |
| C403.2.7 FBC EC. |
| |
| 19) M-201: INDICATE HOW ACCESS WILL BE PROVIDED FOR |
| SERVICE AND REPLACEMENT OF FCU-1-14 & RF-1- SECTION |
| 306.1 FBC M |
| |
| 20) M-202: MANY FCU'S ARE INSTALLED ABOVE HARD CEILINGS |
| THAT REQUIRE ACCESS PANELS- SECTION 306.1 FBC M. |
| |
| 21) REQUIRED SUBMITTALS TO APPROVED BY THE EOR: PLEASE |
| NOTE THAT THE SUBMITTALS LISTED BELOW AND THE WIND LOAD |
| ENGINEERING MAY BE DEFERRED BY REQUEST. |
| |
| A) FIRE SMOKE DAMPERS |
| B) FIRE DAMPERS |
| C) MOTORIZED DAMPERS |
| D) DUCT SMOKE DETECTORS |
| E) WATER HEATERS AND VENT PIPING |
| F) O/A AND EXHAUST LOUVERS INCLUDING FL. PRODUCT |
| APPROVALS AND/OR MIAMI-DADE NOA'S |
| G) OR DUCTS & MRI DUCTS AND EXHAUST FANS |
| H) PIPE AND DUCT INSULATIONS |
| |
| PLEASE NOTE THAT ADDITIONAL COMMENTS MAY OCCUR WHEN |
| CORRECTED PLANS AND SPECIFICATIONS ARE RESUBMITTED. |
| WHEN RESUBMITTING PLEASE PROVIDE A RESPONSE LETTER |
| ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL |
| FORM. ADDITIONALLY, PLEASE INSERT CORRECTED PLAN SHEETS |
| INTO THE SETS, REMOVE THE PREVIOUSLY REVIEWED SHEETS |
| AND MARK VOID ON THEM, AND KEEP THEM WITH THE |
| SUBMITTALS |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |
| |