2019-02-06 17:38:403RD REVIEW FBC-2017 MECHANICAL
 PERMIT #18081039
 2/7/19
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC R- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
 FACILITIES
 ASHRAE 170-2008.
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) COMCHECK ENERGY COMPLIANCE RESUBMITTED REPORT:
  
 A) THE BTUH COOLING CAPACITIES FOR AHU- 1& 2 AND THE
 DOAS- 1 & 2 DO NOT MATCH THE CAPACITIES SHOWN IN TH
 SCHEDULE ON SHEET M-701.
 B) REFERENCE IS MADE TO IPLV RATINGS CH-1 & 2 THAT ARE
 NOT SHOWN IN THE SCHEDULES- SEE TABLE C403.2.3(7) FBC
 EC.
 C) COOLING AND HEATING CAPACITIES FOR FCU 1-7, 1-8, &
 1-9 ARE REVERSED.
 D) HEATING CAPACITIES FOR MANY OF THE FCU'S DO NOT
 MATCH THE CAPACITIES IN THE SCHEDULE.
  
 2) SHEET M-703: THE VENTILATION CALCULATIONS FOR (OR'S
 # 442, 443, 444, & 445), & (ROOMS 451,453, 457, 458)
 AND THE FOURTH FLOOR POST-OP AND PRE-OP ROOMS ARE NOT
 SHOWN IN THE SCHEDULE. AS PREVIOUSLY NOTED THE SCHEDULE
 IS NOT IN COMPLIANCE WITH TABLE 7-1 ASHRAE-170 WHICH
 REQUIRES MINIMUM OUTDOOR AIR CHANGES AND MINIMUM TOTAL
 SUIPPLY AIR CHANGES AND PRESSURE RELATIONSHIPS TO BE
 SHOWN FOR ALL ROOMS AND SPACES. ALSO IT IS NOT CLEAR
 HOW THE PRESSURE RELATIONSHIPS WILL BE MONITORED. WILL
 SENSORS BE INSTALLED?
  
 3) M-201: THE SUBMITTED SPECIFICATIONS FOR THE CUMMINGS
 EMERGENCY GENERATOR INDICATE THE UNIT IS A LEVEL 2
 SYSTEM , HOWEVER THE AMBULATORY SURGICAL CENTER
 REQUIRES A LEVEL 1 SYSTEM- SEE SECTION 451.3.13 FBC B
 AND SECTIONS 4.4.1 & NFPA 110. THE GENERATOR SHALL ALSO
 BE UL 2200 LISTED AND LABELED, AND IN COMPLIANCE WITH
 NFPA 37- SECTION 915.1 FBC M.
  
 4) M-201: COMMENT #5 FROM THE PREVIOUS REVIEW STILL
 EXISTS : THE REQUESTED MANUFACTURER'S SPECIFICATIONS
 FOR THE GENERATOR AND ASSOCIATED EQUIPMENT INCLUDING
 THE VENT PIPING WERE NOT SUBMITTED. THE EXHAUST FLUE
 TERMINATION REQUIRED CLEARANCE MEASUREMENTS NOT
 PROVIDED ON THE PLAN.
 A) PROVIDE AN EXHAUST FLUE DIAGRAM THAT INCLUDES THE
 TOTAL RUN LENGTH, AND INDICATE HOW THE PIPE WILL BE
 SUPPORTED.
 B) VERIFY THE EXHAUST SYSTEM INCLUDING SILENCER COMPLY
 WITH THE GENERATOR ENGINE'S MAX BACKPRESSURE- PLEASE
 PROVIDE A CALCULATION.
 C) CLARIFY HOW THE RADIATOR EXHAUST AT THE TOP OF THE
 GENERATOR WILL BE VENTED TO THE OUTDOORS.THE GENERATOR
 ROOM IS ONLY OPEN ON ONE SIDE AND MAY BE SUBJECT TO
 POSITIVE PRESSURE WHICH WOULD TRAP THE EXHAUST IN THE
 ROOM. PLEAS NOTE THAT SECTION 7.7.4.2 NFPA 110 REQUIRES
 THE RADIATOR DISCHARGE TO BE DUCTED OUTDOORS OR TO AN
 EXTERIOR OPENING BY A 2-HOUR FIRE RATED AIR TRANSFER
 SYSTEM.
 D) SHOW ALL REQUIRED VENT PIPING RUNS, AND TERMINATION
 LOCATIONS. INDICATE THE TYPE AND SIZE OF THE PIPING.
  
 5) A-001 & M-201: REFER TO SECTION 7.2.1.1: THE EPS
 (GENERATOR) ROOM SHALL BE SEPARATED FROM THE REST OF
 THE BUILDING BY 2-HR FIRE RESISTANCE RATED
 CONSTRUCTION. THE PLANS ARE INDICATING 1-HR FIRE RATED
 WALLS ENCLOSING THE ROOM. PLEASE NOTE THE FLOOR/CEILING
 ASSEMBLY ABOVE THE ROOM MUSTL ALSO BE 2-HR. FIRE-RATED
 - PLEASE CORRECT THE PLANS.
  
 6) M-201: REFER TO SECTIONS 7.7.1 & 7.7.7 NFPA 110 AND
 PROVIDE VERIFICATION FROM THE GENERATOR MANUFACTURER
 THAT THE VENTILATION SYSTEM, AS CURRENTLY DESIGNED,
 WILL LIMIT THE MAXIMUM AMBIENT AIR TEMPERATURE IN THE
 ENCLOSURE TO THE MAXIMUM AIR TEMNPERATURE REQUIRED BY
 THE MANUFACTURER.
  
 7) REFER TO SECTION 451.3.13.1 FBC B AND PROVIDE A
 NARRATIVE THAT VERIFIES THAT A TYPE 1 ESSENTIAL
 ELECTRICAL SYSTEM HAS BEEN PROVIDED FOR THE FACILITY AS
 DESCRIBED BY NFPA 99
  
 8) M-201 & M-703: THE ARE NO EXHAUST AIR FLOW CHANGES
 SHOWN IN THE SCHEDULE FOR THE FUTURE MRI ROOMS, HOWEVER
 EXHAUST IS SHOWN ON THE PLAN.
  
 9) M-201: PLEASE CLARIFY IF THE LOCATION OF THE
 CRYOGENIC EXHAUST DUCT TERMINATION IS LOCATED IN A
 VENTILATED SOFFIT, AND INDICATE THE TYPE AND SIZE OF
 EXHAUST DUCT MATERIAL- SECTIONS 510.9 FBC M.
  
 10) M-201: THE EXHAUST DUCT FROM THE MEDGAS ROOM SHALL
 BE ENCLOSED IN 2-HR FIRE-RATED CONSTRUCTION IN
 ACCORDANCE WITH SECTION 510.7.3 FBC M. A) PLEASE
 PROVIDE DETAILS AND PROTECTION FOR THE EF-4 OPENING
 FROM WIND PRESSURE AND WIND BORNE DEBRIS- SECTION
 301.15 FBC M. B) INDICTE THE TYPE OF DUCTWORK TO BE
 INSTALLED- SECTION 510.9 FBC M.
  
 11) M-201: IT APPEARS THAT THE EF-4 EXHAUST OUTLET IS
 LESS THAN THE 10' REQUIRED CLEARANCE DISTANCE TO THE
 DOOR OPENING- SECTION 501.3.1 (2) FBC M. A) THE GARAGE
 EXHAUST DUCT ALSO APPEARS TO BE WITHIN THE REQUIRED 3'
 CLEARANCE PER 501.3.1 (3).
  
 12) M-201: INDICATE HOW MAKEUP AIR IS BEING PROVIDED
 FOR THE MEDGAS ROOM EXHAUST, AND PROVIDE A SEQUENCE OF
 OPERATION FOR THE FAN- SEE SECTION 510.6.5 FBC M AND
 60.3.2.5.3 FFPC- 2017. A) CLARIFY HOW EF-4 WAS SIZED
 AND PROVIDE AN EXHAUST VENTILATION CALCULATION.
  
 13) M-201: RETURN AIR CANNOT BE TAKEN FROM THE MEP ROOM
 101- SECTION 601.5 (7) FBC M.
  
 14) M-201, 202, 203: PROVIDE DETAILS OR NOTES ON THE
 PLAN TO VERIFY COMPLIANCE WITH ONE OF THE THREE
 EXCEPTIONS FOR REQUIRED DUCT SMOKE DETECTORS LISTED
 UNDER SECTION 606.2.2: COMMON SUPPLY SYSTEMS.
 WHERE MULTIPLE AIR-HANDLING SYSTEMS SHARE COMMON SUPPLY
 WITH A COMBINED DESIGN CAPACITY GREATER THAN 2,000 CFM
 (0.9 M3/S), EACH SUPPLY AIR SYSTEM SHALL BE PROVIDED
 WITH SMOKE DETECTORS IN ACCORDANCE WITH SECTION
 606.2.1.
  
 EXCEPTION: INDIVIDUAL SMOKE DETECTORS SHALL NOT BE
 REQUIRED FOR EACH FAN-POWERED TERMINAL UNIT, PROVIDED
 THAT SUCH UNITS DO NOT HAVE AN INDIVIDUAL DESIGN
 CAPACITY GREATER THAN 2,000 CFM (0.9 M3/S) AND WILL BE
 SHUT DOWN BY ACTIVATION OF ONE OF THE FOLLOWING:
 1.SMOKE DETECTORS REQUIRED BY SECTIONS 606.2.1 AND
 606.2.3.
 2.AN APPROVED AREA SMOKE DETECTOR SYSTEM LOCATED IN THE
 RETURN AIR PLENUM SERVING SUCH UNITS.
 3.AN AREA SMOKE DETECTOR SYSTEM AS PRESCRIBED IN THE
 EXCEPTION TO SECTION 606.2.1.
  
 15) M-201 ENCLOSED GARAGE:
 A) SHOW THE LOCATIONS OF THE CO/NO2 SENSORS.
 B) PROVIDE AN EXHAUST VENTILATION CALCULATION TO VERIFY
 FAN SIZING- SECTION 404.2 FBC M.
 C) THE SPECS FOR THE SENSORS DO NOT INDICATE THE
 SENSORS ARE LISTED OR HAVE BEEN TESTED IN ACCORDANCE
 WITH ANY STANDARD- SECTION 304.1 FBC M. D) REFER TO
 SECTION 502.1.1:
 D) IT DOES NOT APPEAR THAT THE LOCATION OF THAT THE
 LOCATION OF THE GARAGE EXHAUST INLET (R3) IS LOCATED IN
 THE AREA OF THE HEAVIEST CONCENTRATION OF CONTAMINANTS.
 E) PROVIDE SUPPORT AND HANGING DETAILS FOR RF-4 AND
 DUCTWORK, AND SHOW THE CLEARANCE HEIGHTS FOR THE FAN
 AND DUCTWORK FROM THE FINISHED GARAGE FLOOR- SECTION
 304.6 FBC M.
 F) PLEASE LABEL R3 AND RF-4 USING THE "E" SYMBOL FOR
 EXHAUST- SECTION 107.2.1 WPB.
  
 16) REPEAT COMMENT #11 FROM THE 1ST REVIEW: M-204:
 PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY SYSTEMS OF
 AHU- 1 & 2, AND DOAS- 1 & 2 PER SECTION 606.2.1 FBC M.
 A) PLEASE REFER TO SECTIONS 606.4 AND 606.4.1 FBC M AND
 PROVIDE FAN SHUTDOWN SEQUENCES. ( IN REPONSE TO THIIS
 COMMENT, THE ENGINEER INDICATES IN THE NARRATIVE THAT
 THE DETECTORS ARE ON ELECTRICAL PLAN SHEETS, HOWEVER
 THIS IS A MECHANICAL CODE REQUIRMENT AND THEY MUST BE
 SHOWN ON THE MECHANICAL PLANS FOR PLAN REVIEW
 COMPLIANCE, AND TO AVOID CONFLICTS IN THE FIELD).
  
 17) THE ENGINEER IS INDICATING IN THE COMMENT RESPONSE
 NARRATIVE THAT THE REQUESTED WIND LOAD ENGINEERING FOR
 THE ROOFTOP AND OTHER EXTERIOR MECHANICAL EQUIPMENT IS
 PROVIDED BY THE MANUFACTURER AND THE NOA'S. A) THE
 SUBMITTED NOA FOR THE DOAS IS MISSING THE INSTALLATION
 PAGES. B) NO ENGINEERING HAS BEEN PROVIDED BY THE
 MANUFACTURER'S OF THE AIR HANDLERS, THE CHILLERS, THE
 FANS, ROOFTOP DUCTWORK AND SUPPORTS ETC. PLEASE NOTE
 THAT SITE SPECIFIC ENGINEERING IS REQUIRED PER SECTION
 301.15 FBC M, AND 1609 FBC B.
  
 18) M-701 & M-703: AN ERV IS REQUIRED DUE TO THE FACT
 THAT EF-1 HAS AN EXHAUST RATE OF 7600 CFMS WHICH
 EXCEEDS THE 4597 CFM SUPPLY AIRFLOW RATE- SEE SECTION
 C403.2.7 FBC EC.
  
 19) M-201: INDICATE HOW ACCESS WILL BE PROVIDED FOR
 SERVICE AND REPLACEMENT OF FCU-1-14 & RF-1- SECTION
 306.1 FBC M
  
 20) M-202: MANY FCU'S ARE INSTALLED ABOVE HARD CEILINGS
 THAT REQUIRE ACCESS PANELS- SECTION 306.1 FBC M.
  
 21) REQUIRED SUBMITTALS TO APPROVED BY THE EOR: PLEASE
 NOTE THAT THE SUBMITTALS LISTED BELOW AND THE WIND LOAD
 ENGINEERING MAY BE DEFERRED BY REQUEST.
  
 A) FIRE SMOKE DAMPERS
 B) FIRE DAMPERS
 C) MOTORIZED DAMPERS
 D) DUCT SMOKE DETECTORS
 E) WATER HEATERS AND VENT PIPING
 F) O/A AND EXHAUST LOUVERS INCLUDING FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 G) OR DUCTS & MRI DUCTS AND EXHAUST FANS
 H) PIPE AND DUCT INSULATIONS
  
 PLEASE NOTE THAT ADDITIONAL COMMENTS MAY OCCUR WHEN
 CORRECTED PLANS AND SPECIFICATIONS ARE RESUBMITTED.
 WHEN RESUBMITTING PLEASE PROVIDE A RESPONSE LETTER
 ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL
 FORM. ADDITIONALLY, PLEASE INSERT CORRECTED PLAN SHEETS
 INTO THE SETS, REMOVE THE PREVIOUSLY REVIEWED SHEETS
 AND MARK VOID ON THEM, AND KEEP THEM WITH THE
 SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved