Plan Review Notes For Permit 18081039
Permit Number 18081039
Review Stop M
Sequence Number 2
Notes
Date Text
2018-12-18 15:19:532ND REVIEW FBC-2017 MECHANICAL
 PERMIT #18081039
 12/18/18
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC R- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
 FACILITIES
 ASHRAE 170-2008.
  
 PLAN REVIEW RESULTS: DENIED.
  
 AN INCOMPLETE RESPONSE NARRATIVE TO MECHANICAL COMMENTS
 THAT ENDED AT COMMENT #17 WAS UPLOADED WITH THE
 CORRECTED PLANS. MISSING FROM THE NARRATIVE ARE
 RESPONSES TO COMMENTS #18- 32.
  
 1) THE COMCHECK COMPLIANCE REPORT IS MISSING DATA FOR
 THE CHILLERS AND THE FAN COIL UNITS. PLEASE NOTE THAT
 THE 8.78 EER FOR CH-1 SHOWN IN THE EQUIPMENT SCHEDULE
 DOES NOT MEET COMPLIANCE WITH TABLE C403.2.3(7) FBC EC.
  
 2) SHEET M-701: PLEASE LIST THE COOLING AND HEATING
 CAPACITIES OF THE AHU 1 & 2, AND DOAS 1 & 2 IN THE
 EQUIPMENT SCHEDULES- SECTION C403.2.1 FBC EC.
  
 3) PLEASE VERIFY THAT COMMISSIONING OF THE MECHANICAL,
 AND ELECTRICAL POWER AND LIGHTING SYSTEMS WILL BE
 ACCOMPLISHED BY EITHER PROVIDING A NOTE OR AN OUTLINE
 ON THE PLAN.
  
 4) M-703: THE ASHRAE 170 VENTILATION RATE SCHEDULE IS
 INCOMPLETE. PLEASE REFER TO TABLE 7-1 ASHRAE 170-2008
 AND PROVIDE COMPLETE DESIGN PARAMETERS THAT INCLUDE
 PRESSURE RELATIONSHIPS TO ADJACENT AREAS, MINIMUM TOTAL
 ACH, EXHAUST AND RECIRCULATION AIR, RELATIVE HUMIDITY,
 AND TEMPERATURE. ALSO MISSING FROM THE SCHEDULE ARE THE
 DESIGN PARAMETERS FOR THE SOILED AND CLEAN HOLDING AND
 UTILITY ROOMS, AND THE HAZARDOUS STORAGE ROOM. INDICATE
 HOW THE PRESSURE RELATIONSHIPS WILL BE MONITORED. WILL
 SENSORS BE INSTALLED?
  
 5) M-201: THE REQUESTED MANUFACTURER'S SPECIFICATIONS
 FOR THE GENERATOR AND ASSOCIATED EQUIPMENT INCLUDING
 THE VENT PIPING WERE NOT SUBMITTED. THE EXHAUST FLUE
 TERMINATION REQUIRED CLEARANCE MEASUREMENTS NOT
 PROVIDED ON THE PLAN. A) PROVIDE AN EXHAUST FLUE
 DIAGRAM THAT INCLUDES THE TOTAL RUN LENGTH, AND
 INDICATE HOW THE PIPE WILL BE SUPPORTED. B) VERIFY THE
 EXHAUST SYSTEM INCLUDING SILENCER COMPLY WITH THE
 GENERATOR ENGINE'S MAX BACKPRESSURE- PLEASE PROVIDE A
 CALCULATION. C) CLARIFY HOW THE RADIATOR EXHAUST AT THE
 TOP OF THE GENERATOR WILL BE VENTED TO THE OUTDOORS.
 THE GENERATOR ROOM IS ONLY OPEN ON ONE SIDE AND MAY BE
 SUBJECT TO POSITIVE PRESSURE WHICH WOULD TRAP THE
 EXHAUST IN THE ROOM.
  
 6) M-201 & M-703: PROVIDE THE DESIGN PARAMETERS AND
 EXHAUST CALCULATIONS FOR THE MRI ROOMS ON THE PLANS AND
 IN THE VENTILATION SCHEDULE. B) PROVIDE A DETAIL
 SHOWING THE LOCATION OF THE CRYOGENIC EXHAUST PIPE
 TERMINATIONS WITH ALL REQUIRED CLEARANCE DISTANCES
 NOTED- SEE SECTION 501.3.1 FBC M.
  
 7) M-201: PLEASE REVISE THE PLANS TO SHOW THE REQUIRED
 MECHANICAL VENTILATION SYSTEM FOR THE MED GAS ROOM IN
 ACCORDANCE WITH SECTION 510.1 AND 510.2 FBC M AND 414.3
 FBC B. THE EXHAUST SYSTEM SHALL BE SIZED TO OPERATE
 CONTINUOUSLY AT A RATE OF 1.0 CFM PER SQ. FT.- SECTION
 60.3.2.5.3 FFPC-2017, AND THE DUCT SYSTEM SHALL EXTEND
 DIRECTLY TO THE EXTERIOR OF THE BUILDING. PLEASE NOTE
 THAT HAZARDOUS EXHAUST DUCTS THAT PENETRATE FIRE-RATED
 WALL ASSEMBLIES SHALL BE ENCLOSED IN FIRE-RESISTANT
 RATED CONSTRUCTION FROM THE POINT OF PENETRATION TO THE
 OUTLET TERMINAL- SECTION 510.7.3 FBC M.
  
 8) REPEAT COMMENT #10 FROM THE 1ST REVIEW: M-201, 202 &
 203: DUCT SMOKE DETECTORS ARE REQUIRED IN THE SUPPLY
 AIR SYSTEMS OF EACH FCU IN COMPLIANCE WITH SECTION
 606.2.2 FBC M. PLEASE PROVIDE A SYMBOL AT EACH FCU TO
 VERIFY COMPLIANCE.
  
 9) REPEAT COMMENT #11 FROM THE 1ST REVIEW: M-204:
 PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY SYSTEMS OF
 AHU- 1 & 2, AND DOAS- 1 & 2 PER SECTION 606.2.1 FBC M.
 A) PLEASE REFER TO SECTIONS 606.4 AND 606.4.1 FBC M AND
 PROVIDE FAN SHUTDOWN SEQUENCES.
  
 10) REFER TO SECTIONS 406.5.2 AND 406.6.2 FBC B: THE
 EAST SECTION OF THE PARKING GARAGE THAT IS BOUNDED BY
 INTERIOR WALLS AND A CEILING IS CLASSIFIED AS ENCLOSED
 AND REQUIRES MECHANICAL VENTILATION IN COMPLIANCE WITH
 SECTIONS 404 AND 502.13 FBC M. PLEASE REVISE THE PLANS
 ACCORDINGLY.
  
 11) M-203: SECOND REQUEST FOR RETURN DUCT SIZES FOR
 FCU-5 & 10.
  
 12) THE DUCTLESS FAN COIL UNITS ARE NOT PERMITTED FOR
 INSTALLATION IN THE INTERIOR EXIT STAIRWAYS IN
 COMPLIANCE WITH SECTION 1023.5 & 1023.6 FBC B.
  
 PRINTED BELOW ARE COMMENTS 22-31 FROM THE 1ST REVIEW
 THAT HAVE NOT BEEN ADDRESSED IN THE RESPONSE NARRATIVE
 AND THE PLANS.
  
 22) M-205: PROVIDE WIND LOAD ENGINEERING FOR
 INSTALLATION OF ALL ROOFTOP MECHANICAL EQUIPMENT
 INCLUDING THE CHILLERS, DOAS?S UNITS, AHU- 1 & 2, EF-1
 &2, H-1 & 2, VENT FLUES, AND THE CHILLED WATER PIPE
 SUPPORTS- SECTION 301.15 FBC M.
  
 23) M-701: PROVIDE EFFICIENCY RATINGS FOR THE DOAS-1 &
 2 UNITS IN THE SCHEDULE- TABLE C403.2.3(1) FBC EC.
  
 24) M-701: THE EFFICIENCY RATING OF CH-1 AT 8.78 EER IS
 DEFICIENT ACCORDING TO TABLE C403.2.3(7) FBC EC.
  
 25) M-701: NO EFFICIENCY RATINGS HAVE BEEN PROVIDED FOR
 THE MRI CH-2- TABLE C403.2.3(7) FBC EC.
  
 26) M-701: ALTHOUGH VENTILATION CALCULATIONS HAVE NOT
 BEEN PROVIDED, IT APPEARS BY THE EXHAUST RATE OF EF-1
 THAT AN ERV WILL BE REQUIRED FOR THE SYSTEM- SEE
 SECTION C403.2.7 FBC EC.
  
 27) CLARIFY IF THE ELEVATOR HOISTWAYS WILL BE VENTED
 AND PROVIDE DETAILS.
  
 28) PROVIDE UL TESTED AND APPROVED FIRESTOPPING
 ASSEMBLIES FOR THE CHILLED WATER PIPING, CONDENSATE
 PIPING, AND DUCTWORK.
  
 29) INDICATE THE R-VALUE AND THICKNESS OF THE CHILLED
 WATER PIPING INSULATION IN THE BUILDING AND ABOVE THE
 ROOF- TABLE C403.2.10 FBC EC.
  
 30) REQUIRED SUBMITTALS TO APPROVED BY THE EOR:
  
 A) FIRE SMOKE DAMPERS
 B) FIRE DAMPERS
 C) MOTORIZED DAMPERS
 D) DUCT SMOKE DETECTORS
 E) GENERATOR
 F) PRE- MANUFACTURED ACCESS PANELS FOR AC UNITS AND
 DAMPERS
 G) WATER HEATERS AND VENT PIPING
 H) O/A AND EXHAUST LOUVERS INCLUDING FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 I) OR DUCTS & DIFFUSERS, & MRI DUCTS AND EXHAUST FANS
 J) PIPE AND DUCT INSULATIONS
  
 31) REFER TO SECTION 451.1.1- 451.1.5 AND CLARIFY IF
 THE PROPOSED PLANS FOR THE AMBULATORY SURGICAL CENTER
 HAS BEEN REVIEWED AND APPROVED BY ACHA.
  
 PLEASE NOTE THAT ADDITIONAL COMMENTS MAY OCCUR WHEN
 CORRECTED PLANS AND SPECIFICATIONS ARE RESUBMITTED.
 WHEN RESUBMITTING PLEASE PROVIDE A RESPONSE LETTER
 ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL
 FORM. ADDITIONALLY, PLEASE INSERT CORRECTED PLAN SHEETS
 INTO THE SETS, REMOVE THE PREVIOUSLY REVIEWED SHEETS
 AND MARK VOID ON THEM, AND KEEP THEM WITH THE
 SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved