Plan Review Notes
Plan Review Notes For Permit 18081039
Permit Number 18081039
Review Stop M
Sequence Number 1
Notes
Date Text
2018-10-16 18:09:11 
 1ST REVIEW FBC-2017 MECHANICAL
 PERMIT #18081039
 10/16/18
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC R- FLORIDA RESIDENTIAL CODE SIXTH EDITION 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE
 FACILITIES
 ASHRAE 170-2008.
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SUBMIT AN ENERGY COMPLIANCE REPORT FOR THE NEW
 BUILDING- SEE SECTIONS C101.2, C101.5.1 AND C401.2 FBC
 EC.
  
 2) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR ALL
 THE NEW SYSTEMS SHOWN ON SHEET IN ACCORDANCE WITH
 SECTION C403.2.1 FBC EC.
  
 3) COMMISSIONING OF THE MECHANICAL, SERVICE AND
 ELECTRICAL POWER AND LIGHTING SYSTEMS IS REQUIRED PER
 SECTIONS C408.1 AND C408.2 FBC-17 ENERGY CONSERVATION.
 PLEASE REVIEW:
  
 SYSTEM COMMISSIONING
 C408.1GENERAL.
 THIS SECTION COVERS THE COMMISSIONING OF THE BUILDING
 MECHANICAL SYSTEMS IN SECTION C403 AND ELECTRICAL POWER
 AND LIGHTING SYSTEMS IN SECTION C405.
 C408.2 MECHANICAL SYSTEMS AND SERVICE WATER-HEATING
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO THE FINAL MECHANICAL AND PLUMBING INSPECTIONS,
 THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER,
 MECHANICAL ENGINEER OR APPROVED AGENCY SHALL PROVIDE
 EVIDENCE OF MECHANICAL SYSTEMS COMMISSIONING AND
 COMPLETION IN ACCORDANCE WITH THE PROVISIONS OF THIS
 SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER OR OWNER?S AUTHORIZED AGENT AND MADE
 AVAILABLE TO THE CODE OFFICIAL UPON REQUEST IN
 ACCORDANCE WITH SECTIONS C408.2.4 AND C408.2.5.
  
 PLEASE NOTE ISSUANCE OF THE CO FOR THE OCCUPANCY IS
 CONTINGENT ON RECEIPT OF A COPY OF THE COMMISSIONING
 REPORT AND RECEIPT OF A LETTER FROM THE OWNERSHIP TO
 VERIFY THEY HAVE RECEIVED A COPY.
  
 4) REFER TO TABLE 7-1 ASHRAE 170-2008 AND PROVIDE THE
 VENTILATION DESIGN PARAMETERS FOR ALL ROOMS AND SPACES
 DESIGNATED FOR MEDICAL USE INCLUDING THE MRI ROOMS
 (NOTE: SEE COMMENT #8).
  
 5) REFER TO TABLE 403.3.1.1 FBC M AND PROVIDE MINIMUM
 VENTILATION RATES FOR ALL ROOMS AND SPACES NOT
 DESIGNATED FOR MEDICAL SUCH AS ADMINISTRATIVE OFFICES,
 EMPLOYEE AREAS, RECEPTION/LOBBY ROOMS, TOILET AND
 LOCKER ROOMS ETC.
  
 6) SHEET M-201: PROVIDE AN ENLARGED DRAWING OF THE
 GENERATOR AND GENERATOR ROOM, AND SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE UNIT AND ALL ASSOCIATED
 EQUIPMENT- SECTION 915.1 FBC M. SHOW THE ENGINE EXHAUST
 VENT PIPE RUN AND TERMINATION LOCATION, SHOW THE
 LOCATION OF THE RADIATOR EXHAUST, AND SHOW HOW THE ROOM
 IS BEING VENTILATED AND HOW MAKEUP AIR IS BEING
 PROVIDED. PLEASE INCLUDE CLEARANCE DISTANCE
 MEASUREMENTS FOR THE EXHAUST TERMINATIONS. THE
 GENERATOR AND ALL ASSOCIATED SPECS SHALL BEAR THE
 APPROVAL STAMP BY THE EOR.
  
 7) M-201: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR
 THE MRI 1 (RM 130-1) EMERGENCY EXHAUST SYSTEM (EF-3)
 AND CLARIFY WHY NO EMERGENCY SYSTEM IS BEING PROVIDED
 FOR MRI-1 (RM 132-1).
  
 8) M-201: CLARIFY HOW THE VENTILATION SYSTEMS AND
 CRYOGENIC EXHAUST SYSTEMS IN THE MRI ROOMS WERE
 CALCULATED AND DESIGNED. INDICATE THE TYPE OF DUCTWORK
 TO BE USED FOR THE SYSTEMS AND SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE MRI EQUIPMENT WITH APPROVAL
 STAMPS BY THE EOR. PLEASE NOTE THAT AIR FROM THE ROOMS
 MAY BE RESTRICTED PER MANUFACTURER'S SPECIFICATIONS.
  
 9) M-201: REFER TO TABLE 7-1 ASHRAE 170-2008 AND
 PROVIDE EXHAUST VENTILATION FOR THE MED GAS STORAGE
 ROOM. SEE ALSO SECTION 9.3.6.5.3 NFPA 99 AND ALL
 SUBSECTIONS FOR MECHANICAL VENTILATION SYSTEM DESIGN
 REQUIREMENTS. BASED ON THE CURRENT PLAN SUBMITTAL AN
 INDOOR STORAGE LOCATION IS ASSUMED. PLEASE NOTE THE
 FOLLOWING: A) FIRE DAMPERS ARE REQUIRED FOR THE
 LOUVERED OPENINGS SHOWN IN THE ROOM- SECTION 607.5.2
 FBC M. B) ALL EXHAUST SHALL DISCHARGE TO THE OUTDOORS-
 SECTION 501.3 FBC M.
  
 10) M-201, 202 & 203: DUCT SMOKE DETECTORS ARE REQUIRED
 IN THE SUPPLY AIR SYSTEMS OF EACH FCU IN COMPLIANCE
 WITH SECTION 606.2.2 FBC M. PLEASE PROVIDE A SYMBOL AT
 EACH FCU TO VERIFY COMPLIANCE.
  
 11) M-204: PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY
 SYSTEMS OF AHU- 1 & 2 PER SECTION 606.2.1 FBC M. A)
 PLEASE REFER TO SECTIONS 606.4 AND 606.4.1 FBC M AND
 PROVIDE FAN SHUITDOWN SEQUENCES.
  
 12) M-201, 202, 203, & 204: INDICATE THE TYPE OF
 SHUTOFF DAMPERS TO BE PROVIDED FOR THE O/A DUCTS- SEE
 SECTION C403.2.4.3 FBC EC.
  
 13) PARKING GARAGE: THE PLANS DO NOT INDICATE WHETHER
 THE PARKING GARAGE IS AN OPEN OR ENCLOSED GARAGE- SEE
 SECTIONS 406.4, 406.5, AND 406.6 FBC B. FOR ENCLOSED
 GARAGES MECHANICAL VENTILATION IS REQUIRED PER SECTIONS
 404.1, 404.2, AND 404.1 FBC M. IF HOWEVER THE GARAGE IS
 CLASSIFIED AS AN "OPEN GARAGE", AND MEETS THE
 REQUIREMENTS OF SECTION 406.5.2 THEN MECHANICAL EXHAUST
 VENTILATION SHALL NOT BE REQUIRED.
  
 14) M-202: MISSING FIRE DAMPER FOR THE 36X24" RELIEF
 AIR OPENING AT THE HYDRO THERAPY ROOM- SECTION 607.5.2
 FBC M.
  
 15) M-202: INDICATE HOW ACCESS WILL BE PROVIDED TO THE
 FAN COIL UNITS LOCATED ABOVE GYPSUM CEILINGS INCLUDING
 FCU 2-1, 2-2, 2-3, 2-4, 2-5, 2-11, AND PU-1- SEE
 SECTION 306.1 FBC M.
  
 16) M-203: MAIN RETURN DUCT SIZES FOR FCU 3-05, 3-09, &
 3-10 NOT SHOWN , AND MANY MISSING O/A BRANCH DUCT
 SIZES.- PLEASE REVIEW THE LAYOUT AND CORRECT.
  
 17) M-404: PLEASE SEE SECTION 451.3.6.2 FBC B: THE VAV
 AND VRH SYSTEMS ARE NOT PERMITTED TO BE USED IN THE
 SURGICAL ROOMS AND THE RECOVERY ROOMS.
  
 18) M-404: MISSING FIRE DAMPERS FOR DUCTS PENETRATING
 FIRE-RATED WALLS TRASH/MAT MAN, SUB-STERILE/STERILIZER
 EQUIP, CORR/EQUIP STORAGE.
  
 19) M-404: THERE IS A VAV IN THE EQUIP STORAGE ROOM NOT
 LABELED.
  
 20) M-404: THE DUCTWORK TO BE USED IN THE OR'S AND
 RECOVERY ROOMS (POST OP) SHALL BE IN COMPLIANCE WITH
 FBC CODE SECTIONS LISTED BELOW. PLEASE REVIEW AND
 VERIFY COMPLIANCE BY SUBMITTING PRODUCT SPECIFICATIONS
 AITH APPROVAL STAMPS BY THE EOR.
  
 451.3.6.3
 FRIABLE DUCT LININGS EXPOSED TO AIR MOVEMENT SHALL NOT
 BE USED IN DUCTS, TERMINAL BOXES OR OTHER SYSTEMS
 SUPPLYING OPERATING ROOMS AND RECOVERY ROOMS, UNLESS
 TERMINAL FILTERS OF AT LEAST 90-PERCENT EFFICIENCY ARE
 INSTALLED DOWNSTREAM OF LININGS. FLEXIBLE DUCT WORK
 SHALL HAVE A CONTINUOUS METAL INNER LINER ENCASED BY
 INSULATING MATERIAL WITH AN OUTER VAPOR JACKET
 CONFORMING TO UL 181 UNLESS THE FLEXIBLE DUCT MEETS THE
 FOLLOWING CRITERIA:
  
 451.3.6.3.1
 THE DUCT CONFORMS TO UL CLASS 1 AIR DUCT, STANDARD 181
 WITH MINIMUM RATED AIR VELOCITY OF 4,000 FEET PER
 MINUTE, AND IS PRESSURE RATED FOR A MINIMUM OF 4-INCHES
 WATER GAGE POSITIVE PRESSURE AND 1-INCH WATER GAGE
 NEGATIVE PRESSURE.
  
 451.3.6.3.2
 THE INNER CORE OF THE DUCT IS CONSTRUCTED OF
 CHLORINATED POLYETHYLENE (CPE) MATERIAL ENCIRCLING A
 STEEL HELIX BONDED TO THE CPE.
  
 451.3.6.3.3
 THE DUCT HAS A FIRE-RETARDANT METALIZED VAPOR BARRIER
 THAT IS REINFORCED WITH CROSSHATCHED FIBERGLASS SCRIM
 HAVING A PERMANENCE OF NOT GREATER THAN 0.05 PERMS WHEN
 TESTED IN ACCORDANCE WITH ASTM E96 PROCEDURE A.
  
 451.3.6.3.4
 THE DUCT HAS PASSED AN IMPACT TEST SIMILAR TO THE UL181
 STANDARD, CONDUCTED BY A NATIONALLY RECOGNIZED TESTING
 LABORATORY (NRTL) EXCEPT IT SHALL USE A 25-POUND WEIGHT
 DROPPED FROM A HEIGHT OF 10 FEET. AS A RESULT OF THE
 TEST, THE INNER AND OUTER SURFACES OF THE SAMPLE SHALL
 NOT HAVE RUPTURED, BROKEN, TORN, RIPPED, COLLAPSED OR
 SEPARATED IN ORDER FOR THE DUCT TO PASS THE TEST. IN
 ADDITION, THE HELIX SHALL REBOUND TO A CROSS-SECTIONAL
 ELLIPTICAL AREA NOT LESS THAN 80 PERCENT OF THE
 ORIGINAL TEST SAMPLE DIAMETER. THE USE OF FLEXIBLE DUCT
 SHALL BE LIMITED TO FLEXIBLE AIR CONNECTOR
 APPLICATIONS.
  
 451.3.6.4
 FILTER HOUSING FRAME BLANK-OFF PANELS SHALL BE
 PERMANENTLY ATTACHED TO THE FRAME, CONSTRUCTED OF RIGID
 MATERIALS AND HAVE SEALING SURFACES EQUAL TO OR GREATER
 THAN THE FILTER MEDIA INSTALLED IN THE FILTER FRAME.
 ALL JOINTS BETWEEN THE BLANK-OFF PANELS, FILTER HOUSING
 FRAMES AND FILTER SUPPORT STRUCTURE SHALL BE CAULKED
 AIR TIGHT.
  
 451.3.6.5
 AIR DUCTS AND EXHAUST SYSTEMS SHALL NOT BE CONSTRUCTED
 OF FIBERGLASS DUCT BOARD.
  
 21) M-205: PROVIDE CONDENSATE DISPOSAL DRAWINGS AND
 DETAILS THAT SHOW THE TYPE AND SIZES OF PIPES, PIPE
 RUNS, PIPE SUPPORTS AND SPACINGS OF SUPPORT, AND PIPE
 DISCHARGE LOCATIONS- SECTION 307. PLEASE PROVIDE A
 RISER DRAWING.
  
 22) M-205: PROVIDE WIND LOAD ENGINEERING FOR
 INSTALLATION OF ALL ROOFTOP MECHANICAL EQUIPMENT
 INCLUDING THE CHILLERS, DOAS SUNITS, AHU- 1 & 2, EF-1
 &2, H-1 & 2, VENT FLUES, AND THE CHILLED WATER PIPE
 SUPPORTS- SECTION 301.15 FBC M.
  
 23) M-701: PROVIDE EFFICIENCY RATINGS FOR THE DOAS-1 &
 2 UNITS IN THE SCHEDULE- TABLE C403.2.3(1) FBC EC.
  
 24) M-701: THE EFFICENCY RATING OF CH-1 AT 8.78 EER IS
 DEFICIENT ACCORDING TO TABLE C403.2.3(7) FBC EC.
  
 25) M-701: NO EFFICENCY RATINGS HAVE BEEN PROVIDED FOR
 THE MRI CH-2- TABLE C403.2.3(7) FBC EC.
  
 26) M-701: ALTHOUGH VENTILATION CALCULATIONS HAVE NOT
 BEEN PROVIDED, IT APPEARS BY THE EXHAUST RATE OF EF-1
 THAT AN ERV WILL BE REQUIRED FOR THE SYSTEM- SEE
 SECTION C403.2.7 FBC EC.
  
 27) CLARIFY IF THE ELEVATOR HOISTWAYS WILL BE VENTED
 AND PROVIDE DETAILS.
  
 28) PROVIDE UL TSTED AND APPROVED FIRESTOPPING
 ASSEMBLIES FOR THE CHILLED WATER PIPING, CONDENSATE
 PIPING, AND DUCTWORK.
  
 29) INDICATE THE R-VALUE AND THICKNESS OF THE CHILLED
 WATER PIPING INSULATION IN THE BUILDING AND ABOVE THE
 ROOF- TABLE C403.2.10 FBC EC.
  
 30) REQUIRED SUBMITTALS TO APPROVED BY THE EOR:
  
 A) FIRE SMOKE DAMPERS
 B) FIRE DAMPERS
 C) MOTORIZED DAMPERS
 D) DUCT SMOKE DETECTORS
 E) GENERATOR
 F) PRE- MANUFACTURED ACCESS PANELS FOR AC UNITS AND
 DAMPERS
 G) WATER HEATERS AND VENT PIPING
 H) O/A AND EXHAUST LOUVERS INCLUDING FL. PRODUCT
 APPROVALS AND/OR MIAMI-DADE NOA'S
 I) OR DUCTS & MRI DUCTS AND EXHAUST FANS
 J) MRI
 K) PIPE AND DUCT INSULATIONS
  
 31) REFER TO SECTION 451.1.1- 451.1.5 AND CLARIFY IF
 THE PROPOSED PLANS FOR THE AMBULATORY SURGICAL CENTER
 HAS BEEN REVIEWED AND APPROVED BY ACHA.
  
 32) NO PERMIT APPLICATION FOR THE PROPOSED [PROJECT WAS
 UPLOADED INTO THE DOCUMENTS. PLEASE PROVIDE A COMPLETE
 APPLICATION THAT INCLUDES THE TOTAL VALUE OF THE
 PROJECT PER SECTION 109.3 WPB.
  
 PLEASE NOTE THAT ADDITIONAL COMMENTS MAY OCCUR WHEN
 CORRECTED PLANS AND SPECIFICATIONS ARE RESUBMITTED.
 WHEN RESUBMITTING PLEASE PROVIDE A RESPONSE LETTER
 ADDRESSING EACH ITEM ALONG WITH THE CITY RE-SUBMITTAL
 FORM. ADDITIONALLY, PLEASE INSERT CORRECTED PLAN SHEETS
 INTO THE SETS, REMOVE THE PREVIOUSLY REVIEWED SHEETS
 AND MARK VOID ON THEM, AND KEEP THEM WITH THE
 SUBMITTALS
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  