2018-10-23 15:41:47 | PLAN SHEET E-1; A GAS TANKLESS WATER HEATER IS SHOWN ON |
| THE PLAN. |
| A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL |
| PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT |
| THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE |
| REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. |
| PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT |
| SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE |
| SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE |
| FBC-R, SEC. G2404.3. |
| GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL |
| GAS SEC. 301.3. |
| A SEPARATE PERMIT AND PLANS IS REQUIRED FOR THE GAS |
| INSTALLATION OR MODIFICATION OF SYSTEM. |
| IF THERE IS AN EXISTING SYSTEM, THE BTU LOAD OF THE |
| EXISTING GAS SYSTEM MUST BE ADDED INTO THE TOTAL BTU |
| LOAD ON THE SYSTEM TO ENSURE THE EXISTING SYSTEM IS |
| PROPERLY SIZED. IF UNDERSIZED, THE EXISTING SYSTEM MUST |
| BE REDONE TO ENSURE A SAFE OPERATING SYSTEM. SUBMIT A |
| GAS PIPING RISER DIAGRAM THAT SHOWS THE TYPE OF |
| EXISTING APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE |
| PIPE SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| EXISTING APPLIANCES. FBCR SECS.G2412.4, G2412.8, |
| G2413.1, G2413.2, G2413.3. |