2018-08-13 16:55:01 | ****CORRECTIONS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| FBC B = FBC BUILDING |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| FBC R = FBC RESIDENTIAL |
| |
| 1. WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED |
| SETS OF DOCUMENTS FOR ISSUANCE. OLD SHEETS (BOTH SETS) |
| SHOULD BE RETAINED IN THE PACKAGE; PLEASE DO NOT |
| DISCARD ANY DOCUMENTS. THEY SHOULD BE BOUND TOGETHER |
| SEPARATELY FROM THE TWO ISSUANCE SETS AND MARKED "VOID" |
| OR "OLD SHEETS". PLEASE DO NOT STAMP THE PLANS VOID AS |
| APPLICANTS ARE INADVERTENTLY STAMPING SHEETS THAT WE |
| NEED "VOID", RENDERING THEM NOT USABLE. |
| |
| 2. FOUNDATION AND STRUCTURE PERMITS REQUIRE THE |
| FOLLOWING: |
| |
| ARCHITECTURAL CROSS SECTION(S) OF THE BUILDING |
| SURVEY DRAWING |
| STORM WATER POLLUTION PREVENTION PLAN |
| SITE PLAN |
| |
| 3. SURVEY/SITE PLAN SHOWING COMPLIANCE WITH FBC B |
| TABLES 705.8, 602. |
| |
| 4. SOME ARCHITECTURAL PAGES WERE SIGNED AND SEALED BY |
| PAUL TWITTY, OTHERS BY WILLIAM HANSER. THIS IS |
| ACCEPTABLE BUT CLARIFY WHO IS THE ARCHITECT OF RECORD |
| FOR THE PROJECT. |
| |
| 5. ADVISORY ONLY; CONTRACTOR IS TO TAKE NOTE OF THE |
| REQUIREMENT THAT SHORING/RESHORE ENGINEERING IS TO BE |
| SUBMITTED, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| FAILURE TO DO SO ***WILL*** RESULT IN A STOP WORK ORDER |
| IF CONTRACTOR PROCEEDS WITHOUT SUBMITTAL OF |
| SHORING/RESHORE ENGINEERING. |
| |
| THIS IS ITEM #7, PAGE 4, THRESHOLD/SPECIAL INSPECTOR |
| OBLIGATIONS IN THE AGREEMENT SIGNED BY ALL PARTIES. |
| |
| 6. FOR FUTURE REFERENCE, THE FOLLOWING IS INFORMATION |
| REQUIRED FOR FOUNDATION PERMITS: |
| |
| PERMIT APPLICATION WHICH STATES SCOPE (FOR FOUNDATION |
| PERMIT, TYPICALLY FOOTINGS OR FOOTINGS AND SLAB) |
| GEOTECHNICAL REPORT |
| SURVEY DRAWING |
| STORM WATER POLLUTION PREVENTION PLAN |
| SITE PLAN |
| 1ST FLOOR ARCHITECTURAL PLAN |
| ARCHITECTURAL CROSS SECTION(S) OF THE BUILDING |
| FOUNDATION PLAN |
| FOUNDATION DETAILS AND CROSS SECTIONS |
| STRUCTURAL ENGINEER'S GENERAL NOTES |
| UNDERGROUND PLUMBING PLAN (IF APPLICABLE) |
| ELECTRICAL PLAN SHOWING ANY UNDERGROUND CONDUIT (IF |
| APPLICABLE) |
| ELECTRICAL GROUNDING TO STEEL DETAIL, IF APPLICABLE (OR |
| EXPLAIN WHY THIS IS NOT APPLICABLE FOR THIS PROJECT). |
| IF REQUIRED, A DETAIL IS REQUIRED AS A REVIEW, PERMIT, |
| AND INSPECTION ARE REQUIRED PRIOR TO CONCRETE POUR |
| PLAN SHOWING UNDERGROUND FIRE LINE |
| THRESHOLD INSPECTION PLAN OR RESIDENT INSPECTION PLAN |
| (AS APPLICABLE) |
| SI OR RESIDENT INSPECTOR AGREEMENT (AS APPLICABLE) |
| THRESHOLD STATEMENT ON PLAN (IF APPLICABLE) |
| THREE SETS OF PLANS FOR RESIDENT INSPECTOR OR THRESHOLD |
| PROJECT |
| |
| ADDITIONAL INFORMATION MAY BE REQUIRED ON A CASE BY |
| CASE BASIS. |
| |
| |
| |