Plan Review Notes For Permit 18071387 |
Permit Number |
18071387 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-08-02 08:46:44 | ****CORRECTIONS**** | | W.P.B. PERMIT: 18071387 | | | | DYLAN BATTLES | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6718 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. [FBC 1511.1]PROVIDE DESIGN DATA FOR WIND LOADS. USE | | MEAN ROOF HEIGHT AND PARAPET HEIGHT TO DETERMINE. | | | | 2. [FBC 1505.1]IS ALL THE ROOF DECK CONCRETE? WHAT IS | | THE TYPE OF CONSTRUCTION AND THE FIRE CLASSIFICATION OF | | NEW ROOF? | | | | 3. [FBC 1511]WHAT IS THE MINIMUM SLOPE AND HOW IS IT | | ACHIEVED? WHERE IS THE EXISTING INSULATION LOCATED IN | | THIS ROOF ASSEMBLY? | | | | 4. [FBC 1511.6] FLASHINGS SHALL BE RECONSTRUCTED IN | | ACCORDANCE WITH APPROVED MANUFACTURER?S INSTALLATION | | INSTRUCTIONS OR RAS 111. METAL FLASHING TO WHICH | | BITUMINOUS MATERIALS ARE TO BE ADHERED SHALL BE PRIMED | | PRIOR TO INSTALLATION. | | | | 5. [FBC 1510]ARE THERE ANY ROOF TOP STRUCTURES? IF SO | | PROVIDE TIE DOWN REQUIREMENTS. | | | | 6. SEE NOTE #12 ON FL2533-R20 FOR UPLIFT TESTING | | REQUIREMENTS. | | | | NOTE: | | -PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW | | EACH COMMENT IS BEING ADDRESSED. | | -ADDITIONAL COMMENTS MAY BE FORTHCOMING PENDING REVIEW | | OF MATERIALS REQUESTED. | | -WHEN RESUBMITTING, PROVIDE TWO IDENTICAL COLLATED SETS | | OF DOCUMENTS FOR ISSUANCE. | | |
|