Plan Review Notes For Permit 18070646 |
Permit Number |
18070646 |
|
Review Stop |
P |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2018-08-07 06:49:34 | THE PLANS SHOW THAT THE TDH CALCULATIONS WERE DONE | | USING THE SIMPLIFIED TDH METHOD. THIS METHOD OF | | CALCULATING THE TDH IS NO LONGER PERRMITTED IN THE 2013 | | EDITION OF APSP 7. THE MAXIMUM FLOW OF THE PUMP FROM | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION | | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT | | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED | | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET | | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS | | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING | | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, | | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT | | THE PUMP. SUBMIT REVISED TDH CALCULATIONS PEERR THE | | 2013 APSP 7. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|