Plan Review Notes For Permit 18070646 |
Permit Number |
18070646 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-07-23 16:42:16 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY PLUMBING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM | | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN | | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC | | 7 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION ADDRESSES | | FLOW RATE IN GALLONS PER MINUTE (GPM). IT REQUIRES THAT | | MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED THE LISTED | | MAXIMUM FLOW RATE OF THE SUCTION OUTLET FITTING | | ASSEMBLY (DRAIN COVER). | | | | 2) INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS | | APPLICABLE TO THE SPECIFIC PUMP BEING INSTALLED ON THIS | | SYSTEM. THIS IS REQUIRED TO MATCH THE CALCULATED TDH TO | | THE MAXIMUM SYSTEM FLOW RATE OF THE SYSTEM ON THE PUMP | | CURVE. | | | | |
|