Plan Review Notes For Permit 18070409 |
Permit Number |
18070409 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-07-23 08:50:20 | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE | | MAXIMUM SYSTEM FLOW FOR THE POOL, THE SPA AND THE POOL | | FEATURE. THE MAXIMUM FLOW OF THE PUMP FROM ITS PUMP | | CURVE IS NO LONGER ALLOWED TO BE USED IN DETERMINING | | MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC 7 - 2013 | | SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION ADDRESSES FLOW | | RATE IN GALLONS PER MINUTE (GPM). IT REQUIRES THAT | | MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED THE LISTED | | MAXIMUM FLOW RATE OF THE SUCTION OUTLET FITTING | | ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS MUST | | INCLUDE ALL OF THE SYSTEM COMPONENTS IN THE PIPING | | SYSTEM INCLUDING THE FILTER. | | 2) SUBMIT TWO COPIES OF THE POOL PUMP CURVE FOR THE | | POOL, THE SPA AND POOL FEATURE. IDENTIFY ON THE PUMP | | CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING | | INSTALLED ON THESE ITEMS. THIS IS NEEDED TO CONFIRM THE | | MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS. | | 3) INDICATE ON THE POOL PUMP SPECS WHICH PUMP IS BEING | | INSTALLED. WPB AMEND. TO FBC SEC. 107.2.1. | | 4) BACKFLOW PREVENTERS MAY BE REQUIRED ON THE | | WATER/FIRE BOWL UNITS. | | 5) THE GAS HEATER SHALL HAVE A MINIMUM OF 82% | | EFFICIENCY PER THE 2017 FBC-ENERGY TABLE C404.2. SUBMIT | | VERIFICATION. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | |
|