2018-07-30 11:49:1406/29/2018 1ST PLUMBING/GAS REVIEW **DENIED** WITH
 COMMENTS.
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SHOW THE TYPE OF PIPE SIZES, AND THE CORRESPONDING
 EHD NUMBER OF THE CORRUGATED STAINLESS STEEL TUBING (IF
 APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO THE
 FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 2. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. IF INSIDE THE GENERATOR PLEASE CLARIFY.
 2017 FBC FUEL GAS RES. SEC. G2421.1.
 3. SHOW SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR AND GENERATOR, PLEASE SHOW
 ON LAYOUT DESIGN, FBC FUEL GAS RES. SEC. G2420.4.
 4. YOUR ISOMETRIC DRAWING CALLS OUT A TANKLESS WATER
 HEATER AS EXCITING WITH RANGE AND DRYER BUT THERE IS NO
 APPLICATION FOR A PERMIT ON FILE IN CITY RECORDS. THIS
 WILL BE REVIEWED AS A NEW SYSTEM. WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 5. SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS
 APPLIANCES. WHERE IS COMBUSTION AIR PROVIDED BY THE
 BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR? 2017 FBC R
 G2407.9.3. COMBINED COMBUSTION AIR AND VENTILATION AIR
 SYSTEM.
 6. SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2017 FBC FUEL GAS RES. SEC.
 G2408.1. ( POOL HEATER, TANKLESS?ECT)
 7. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE
 INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT
 SHALL BE ONSITE AT THE TIME OF INSPECTION 2017 FBC FUEL
 GAS RES. SEC. G2413.2 AND G2404.3.
 8. SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
 9. A SUB ELECTRICAL PERMIT IS REQUIRED FOR THE SOURCE
 OF IGNITION, WPB AMENDMENTS TO THE FBC SEC 105.1
 10. SUBMIT TWO COPIES OF THE TABLE FOR INSTALLATION
 CLEARANCES FROM THE TANKLESS INSTALLATION MANUAL. THE
 MANUAL REQUIRES A CLEARANCE OF EITHER 4 FEET OR 12
 INCHES FROM ANY OPERABLE WINDOWS OR DOORS. SHOW THE
 LOCATION OF ALL OPERABLE WINDOWS AND DOORS ON THE PLAN
 AND THE DISTANCE OF THE TANKLESS WATER HEATER FROM
 EACH. WPB AMENDMENTS TO THE FBC SEC. 107.2.1.
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  
  
 PLUMB <5K


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved