2018-06-30 12:11:2806/30/2018 PLUMBING 1ST REVIEW**DENIED**
  
 1) MUST SHOW (TDH) TOTAL DYNAMIC HEAD ON HOW THE
 COMPLETE PIPING SYSTEM WAS SIZED. ANSI/ APSP 7, 15
  
 2) PROVIDE MANUFACTURE MAIN DRAIN SPEC'S SHOWING FLOW
 RATE AND THAT IT COMPLIES WITH VGB. FBC 107.2.1
  
 3) APPLICATION IS CALLING OUT FOR A HEAT PUMP POOL
 HEATER BUT MANUFACTURE MANUAL PROVIDED IS FOR A GAS
 POOL HEATER. PLEASE CLARIFY. PROVIDE A COMPLETE GAS
 PLAN AND SEPERATE PERMIT APPLICATION IF IN FACT THE
 UNIT IS GOING TO BE GAS.
  