Date |
Text |
2018-06-13 16:53:35 | 06/13/2018 1ST GAS REVISION**DENIED** |
| |
| 1) YOUR SHOWING A 21KW GENERATOR BUT THE APPROVED |
| GENERATOR PERMIT IS FOR 16KW. IF THIS IS THE CASE A |
| COMPLETE REVISION WILL BE REQUIRED. FBC 107.2.1 |
| |
| 2) YOUR NEW ISOMETRIC DOES NOT SHOW THE PRESSURE |
| REGUALTOR CONNECTING TO THE EXISTING SYSTEM. SHOW THE |
| LOCATION OF ALL MP (STEP-DOWN) REGULATORS. A LISTED |
| SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY AHEAD OF |
| EACH MP REGULATOR. 2017 FBC-FUEL GAS SEC.409.4, |
| FBC-RESIDENTIAL SEC. G 2420.4. |
| |
| 3) AFTER REVIEWING EXISTING CITY RECORDS TO VERIFY WHAT |
| GAS TABLE'S THE SYSTEM WAS BASED ON AT THE TIME OF |
| SERVICE SINCE YOU ARE CHANGING FROM THE APPROVED PLAN |
| IT APPEARS THERE IS A POOL HEATER AND A BBQ LOAD NOT |
| INCLUDED ON YOUR ISOMETRIC NOR HAVE YOU LISTED ANY OF |
| THE BTU'S LOADS. LIST THE BTU LOAD OF EACH APPLIANCE |
| AND THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2017 |
| FBC-FUEL GAS SECS.401.8, 402.2, AND TABLES 402.4 (1) |
| THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2413.4 |
| AND TABLES G2413.4 (1 ) THROUGH G2413.4 (21). |
| |
| 4) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| APPLIANCE. COMPLY WITH 2017 FBC-FUEL GAS SEC. 402.4.1 |
| OR 2017 FBC-RES. SEC. G2413.4.1, G2413.4.2 FOR THE |
| PROPER PIPE SIZE AND BTU LOAD. |
| |
| 5) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| CORRUGATED STAINLESS STEEL TUBING |
| (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO |
| FBC SEC.107.2.1. |
| |
| |
| TIM HUNT |
| PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| 561-805-6695 |
| [email protected] |
| |