Plan Review Notes For Permit 18060360 |
Permit Number |
18060360 |
|
Review Stop |
E |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2018-08-11 10:08:07 | THIS PLAN HAS BEEN PASSED PROVISIONALLY: | | | | ELECTRICAL CONTRACTOR NEEDED FOR INSTALLTION OF TIME | | CLOCK REQUIRED BY FBC CE 405.2.4 AND DISCONNECT | | REQUIRED BY NEC 2014 600.6A1. FAILURE TO OBTAIN | | ELEC-SUB PERMIT BY LICENSED ELECTRICIAN FOR TIMECLOCK | | AND DISCONNECT WILL RESULT IN 4X PERMIT FEE FOR WORK | | PERFORMED WITHOUT A PERMIT. | | | | PLEASE SEE SCOPE OF WORK FOR AN ES (ELECTRICAL SIGN | | SPECIALTY CONTRACTOR) | | | | SIGN CONTRACTORS F.S. 489.505 (#19) AND F.A.C. | | 61G6-7.001 SPECIALTY ELECTRICAL CONTRACTORS (#2 SIGN | | SPECIALTY CONTRACTOR) | | | | THE SCOPE OF CERTIFICATION INCLUDES THE STRUCTURAL | | FABRICATION INCLUDING CONCRETE FOUNDATION, ERECTION, | | INSTALLATION, ALTERATION, REPAIR, SERVICE AND WIRING OF | | ELECTRICAL SIGNS AND OUTLINE LIGHTING. THE SCOPE OF | | CERTIFICATION SHALL NOT INCLUDE THE PROVISION OF, OR | | ANY ELECTRICAL WORK BEYOND, THE LAST DISCONNECT MEAN OR | | TERMINAL POINTS. HOWEVER, A CONTRACTOR CERTIFIED UNDER | | THIS SECTION MAY PROVIDE THE ELECTRICAL ENTRANCE | | REQUIREMENTS FOR METERING AND MAIN DISCONNECT OF REMOTE | | BILLBOARDS OR SIGNS WHICH ARE INDEPENDENT OF ANY | | STRUCTURE OR BUILDING AND WHICH REQUIRE NO MORE THAN | | TWENTY-FIVE (25) KILOWATTS AT TWO HUNDRED FIFTY (250) | | VOLTS MAXIMUM | | |
|