2018-06-03 05:10:181) CITY RECORDS SHOW THE TOTAL BTU GAS LOAD TO THE
 EXISTING GAS APPLIANCES AS 153, 000 NOT 117,000 AS
 SHOWN ON THE SUBMITTED GAS DRAWING. REVISE THE
 SUBMITTED GAS PLAN TO COMPLY WITH THE EXISTING RECORD
 ON FILE.2017 FBC-FUEL GAS SEC.401.4.
 2) CITY RECORDS SHOW THE MOST REMOTE OUTLET TO THE
 EXISTING APPLIANCES AS 140 FEET FROM THE POINT OF
 DELIVERY. THIS DISTANCE SHALL BE USED IN SIZING THE GAS
 SYSTEM. 2017 FBC-FUEL GAS SEC.402.4.1.
 3) THE EXISTING LOAD TABLE NOTES THE EXISTING LOAD AS
 117,000 BTU'S BUT THE GAS DRAWING SHOWS THE EXISTING
 LOAD AS 88,000 BTU'S. ????? REVISE THE DRAWING TO
 COMPLY WITH COMMENTS # 1 & 2 ABOVE.
 4) THE GAS DRAWING REFERENCES TABLE 402.4 (22) WHICH IS
 FOR A 2 PSI PRESSURE BUT YOU HAVE SUBMITTED THE TABLE
 FOR A PE LESS THAN 2 PSI SYSTEM 402.4 (21). WHICH IS
 IT, 2 PSI OR LESS THAN 2 PSI?
 5) YOU HAVE SUBMITTED SPECIFICATIONS FOR REGULAORS. IF
 THIS IS LESS THAN A 2 PSI SYSTEM, WHY THE REGULATORS?
 CLARIFY.
 6) IF THIS IS GOING TO BE A 2 PSI SYSTEM, INDICATE ON
 THE REGULATOR SPECS THE MODEL BEING INSTALLED. WPB
 AMEND. TO FBC SEC. 107.2.1.
 7) THE MINIMUM SIZE LINE TO THE EXISTING APPLIANCES
 SHALL BE 1 INCH IF THIS IS TO REMAIN A LESS THAN 2 PSI
 SYSTEM. CLARIFY.
 8) THE MINIMU SIZE SCH. 40 METALLIC PIPE AT THE OUTLET
 OF THE GAS METER SHALL BE 2 INCHES PER TABLE 402.4 (2)
 AAT 140 FEET.
 9) THE NEW TOTAL BTU LOAD OF THE SYSTEM IS 434,000
 BTU'S NOT 398,000 AS SHOWN ON THE PLANS.
 10) THE MINIMUM SIZE METALLIC PIPE TO THE GENERATOR
 SHALL BE 1 1/4 INCHES PER TABLE 402.4(2) AT 140 FEET
 DISTANCE TO THE MOST REMOTE OUTLET ON THE SYSTEM PER
 THE EXISTING GAS PLAN.
 11) SUBMIT MANUF. SPECS FOR THE FLEX CONNECTOR FOR THE
 GENERATOR. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 FLEX CONNECTOR FOR THE GENERATOR. THE FLEX CONNECTOR
 SHALL BE APPROVED TO FLOW THE MAXIMUM BTU LOAD FOR THE
 GENERATOR. 2017 FBCR SEC. G2422.1 (8), 2017 FBC-FUEL
 GAS SEC. 411.1.3.2.
 12) THE GENERATOR EXHAUST SHALL BE A MINIMUM OF 10 FEET
 FROM ANYBUILDING OPENING INCLUDING SOFFIT SCREENS/ATTIC
 VENTS.
  
 NOTE: I HAVE PLACED TWO COPIES OF THE EXISTING GAS PLAN
 FROM CITY RECORDS TO BE USED AS A REFERENCE ONLY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved