Date |
Text |
2018-07-05 08:12:00 | BUILDING PROVISO-REVISION TO INCLUDE CONSTRUCTION OF |
| THE BUILDING SHELL TO SCOPE OF WORK FOR PERMIT |
| #18051004 |
| FBC 107.3.3 PHASED APPROVAL.THE BUILDING OFFICIAL IS |
| AUTHORIZED TO ISSUE A PERMIT FOR THE CONSTRUCTION OF |
| FOUNDATIONS OR ANY OTHER PART OF A BUILDING OR |
| STRUCTURE BEFORE THE CONSTRUCTION |
| DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN |
| SUBMITTED, PROVIDED THAT ADEQUATE INFORMATION AND |
| DETAILED STATEMENTS HAVE BEEN FILED COMPLYING WITH |
| PERTINENT REQUIREMENTS OF |
| THIS CODE. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION |
| OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED |
| AT THE HOLDER'S OWN RISK WITH THE BUILDING OPERATION |
| AND WITHOUT ASSURANCE THAT |
| A PERMIT FOR THE ENTIRE STRUCTURE WILL BE GRANTED. |
| |
| APPROVED WITH EXCEPTION |
| THIS PLAN REVISION HAS BEEN APPROVED PROVISIONALLY. |
| FAILURE TO CORRECT THE LISTED DEFICIENCIES IN THESE |
| PLAN DOCUMENTS PRIOR TO INSPECTIONS WILL RESULT IN |
| FAILED INSPECTIONS AND THE ASSETMENT OF RE-INSPECTION |
| FEES. |
| |
| THIS PROJECT IS LOCATED IN A SPECIAL FLOOD HAZARD ZONE |
| (AE). THE BASE FLOOD ELEVATION FOR THIS PROJECT IS |
| 9'-0" NAVD 88, WHICH INCLUDES THE TWO FOOT FREEBOARD |
| REQUIRED BY THE CITY OF WEST PALM BEACHES FLOOD |
| ORDINANCE. THE MINIMUM FINISH FLOOR ELEVATION OF THE |
| LOWEST HABITABLE FLOOR AND ALL OF THE EQUIPMENT THAT |
| SERVICES THE BUILDING ARE REQUIRED TO BE AT OR ABOVE |
| THE 9'-0" BFE. ON SHEET S3.1 THE FIRE PUMP ROOM IS |
| SPECIFIED WITH THE TOP OF SLAB AS (-) 1'-6" AND THE TOP |
| OF SLAB FOR THE GROUND FLOOR RESIDENCE IS 0'-0". THE |
| CIVIL PLANS SPECIFY THE SLAB OF THE GROUND FLOOR |
| RESIDENCE AS 9'-0" NAVD. THE FIRE PUMP SERVICES THE |
| RESIDENTIAL BUILDING AND IS REQUIRED TO BE LOCATED AT |
| OR ABOVE THE BFE. THEREFORE, THE FIRE PUMP ROOM SLAB |
| CAN NOT BE LOCATED AT (-) 1'-6" BELOW THE REQUIRED |
| 9'-0" NAVD. |
| |
| NOTE: POST TENSION SLABS. 107.3.4.2 DEFERRED |
| SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |
| FBC 3306.1 PROTECTION REQUIRED. PEDESTRIANS SHALL BE |
| PROTECTED DURING CONSTRUCTION, REMODELING AND |
| DEMOLITION ACTIVITIES AS REQUIRED BY THIS CHAPTER AND |
| TABLE 3306.1. SIGNS SHALL BE PROVIDED TO DIRECT |
| PEDESTRIAN TRAFFIC. |
| FBC 3306.2 WALKWAYS. A WALKWAY SHALL BE PROVIDED FOR |
| PEDESTRIAN TRAVEL IN FRONT OF EVERY CONSTRUCTION AND |
| DEMOLITION SITE UNLESS THE APPLICABLE GOVERNING |
| AUTHORITY AUTHORIZES THE SIDEWALK TO BE FENCED OR |
| CLOSED. WALKWAYS SHALL BE OF SUFFICIENT WIDTH TO |
| ACCOMMODATE THE PEDESTRIAN TRAFFIC, BUT IN NO CASE |
| SHALL THEY BE LESS THAN 4 FEET (1219 MM) IN WIDTH. |
| WALKWAYS SHALL BE PROVIDED WITH A DURABLE WALKING |
| SURFACE. WALKWAYS SHALL BE ACCESSIBLE IN ACCORDANCE |
| WITH CHAPTER 11 AND SHALL BE DESIGNED TO SUPPORT ALL |
| IMPOSED LOADS AND IN NO CASE SHALL THE DESIGN LIVE LOAD |
| BE LESS THAN 150 POUNDS PER SQUARE FOOT (PSF) (7.2 |
| KN/M2). |
| FBC 3306.5 BARRIERS. BARRIERS SHALL BE NOT LESS THAN 8 |
| FEET (2438 MM) IN HEIGHT AND SHALL BE PLACED ON THE |
| SIDE OF THE WALKWAY NEAREST THE CONSTRUCTION. BARRIERS |
| SHALL EXTEND THE ENTIRE LENGTH OF THE CONSTRUCTION |
| SITE. OPENINGS IN SUCH BARRIERS SHALL BE PROTECTED BY |
| DOORS WHICH ARE NORMALLY KEPT CLOSED. |
| FBC 3306.7 COVERED WALKWAYS. COVERED WALKWAYS SHALL |
| HAVE A CLEAR HEIGHT OF NOT LESS THAN 8 FEET (2438 MM) |
| AS MEASURED FROM THE FLOOR SURFACE TO THE CANOPY |
| OVERHEAD. ADEQUATE LIGHTING SHALL BE PROVIDED AT ALL |
| TIMES. COVERED WALKWAYS SHALL BE DESIGNED TO SUPPORT |
| ALL IMPOSED LOADS. IN NO CASE SHALL THE DESIGN LIVE |
| LOAD BE LESS THAN 150 PSF (7.2 KN/M2) FOR THE ENTIRE |
| STRUCTURE. |
| FBC 3306.8 REPAIR, MAINTENANCE AND REMOVAL. PEDESTRIAN |
| PROTECTION REQUIRED BY THIS CHAPTER SHALL BE MAINTAINED |
| IN PLACE AND KEPT IN GOOD ORDER FOR THE ENTIRE LENGTH |
| OF TIME PEDESTRIANS ARE SUBJECT TO BEING ENDANGERED. |
| THE OWNER OR THE OWNER'S AGENT, UPON THE COMPLETION OF |
| THE CONSTRUCTION ACTIVITY, SHALL IMMEDIATELY REMOVE |
| WALKWAYS, DEBRIS AND OTHER OBSTRUCTIONS AND LEAVE SUCH |
| PUBLIC PROPERTY IN AS GOOD A CONDITION AS IT WAS BEFORE |
| SUCH WORK WAS COMMENCED. |
| |
| FBC 3307.1 PROTECTION REQUIRED. ADJOINING PUBLIC AND |
| PRIVATE PROPERTY SHALL BE PROTECTED FROM DAMAGE DURING |
| CONSTRUCTION, REMODELING AND DEMOLITION WORK. |
| PROTECTION SHALL BE PROVIDED FOR FOOTINGS, FOUNDATIONS, |
| PARTY WALLS, CHIMNEYS, SKYLIGHTS AND ROOFS. PROVISIONS |
| SHALL BE MADE TO CONTROL WATER RUNOFF AND EROSION |
| DURING CONSTRUCTION OR DEMOLITION ACTIVITIES. THE |
| PERSON MAKING OR CAUSING AN EXCAVATION TO BE MADE SHALL |
| PROVIDE WRITTEN NOTICE TO THE OWNERS OF ADJOINING |
| BUILDINGS ADVISING THEM THAT THE EXCAVATION IS TO BE |
| MADE AND THAT THE ADJOINING BUILDINGS SHOULD BE |
| PROTECTED. SAID NOTIFICATION SHALL BE DELIVERED NOT |
| LESS THAN 10 DAYS PRIOR TO THE SCHEDULED STARTING DATE |
| OF THE EXCAVATION. |
| |
| 3310.1 STAIRWAYS REQUIRED. WHERE A BUILDING HAS BEEN |
| CONSTRUCTED TO A BUILDING HEIGHT OF 50 FEET (15 240 MM) |
| OR FOUR STORIES, OR WHERE AN EXISTING BUILDING |
| EXCEEDING 50 FEET (15 240 MM) IN BUILDING HEIGHT IS |
| ALTERED, NO FEWER THAN ONE TEMPORARY LIGHTED STAIRWAY |
| SHALL BE PROVIDED UNLESS ONE OR MORE OF THE PERMANENT |
| STAIRWAYS ARE ERECTED AS THE CONSTRUCTION PROGRESSES. |
| |
| ADDRESS THE ART IN PUBLIC PLACES COMMENTS. THE CITY OF |
| WEST PALM BEACH ART IN PUBLIC PLACES ORDINANCE |
| REQUIREMENT THAT APPLIES TO ANY REMODEL OR NEW |
| CONSTRUCTION PROJECT FOR WHICH THE PERMIT APPLICATION |
| WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL PROJECT |
| CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN |
| $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. |
| PER CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND |
| CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, |
| ART IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION |
| 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL |
| PROJECT CONSTRUCTION COST. |
| PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE |
| V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND |
| NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO |
| THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE |
| PROJECTS. |
| SEC. 78-129. - PUBLIC ART ASSESSMENT FOR PRIVATE |
| DEVELOPMENT. |
| (A) APPLICABILITY. THE PROVISIONS OF THIS ARTICLE AND |
| THE PUBLIC ART ASSESSMENT SECTION SHALL APPLY TO ALL |
| PRIVATE DEVELOPMENT PROJECTS, INCLUDING NEW |
| CONSTRUCTION, OR THE RENOVATION OR IMPROVEMENT OF AN |
| EXISTING BUILDING, WHERE TOTAL CONSTRUCTION COSTS ARE |
| EQUAL TO OR GREATER THAN $750,000.00. ALL BUILDINGS |
| WITHIN NEW PLANNED DEVELOPMENTS SHALL BE ASSESSED |
| CUMULATIVELY TOWARDS THIS ART IN PUBLIC PLACES |
| REQUIREMENT, EVEN IF THE BUILDINGS ARE PERMITTED |
| SEPARATELY OR DEVELOPED IN PHASES. THE PROVISIONS OF |
| THIS SECTION APPLY TO NEW DEVELOPMENT OR NEW |
| CONSTRUCTION WITHIN EXISTING PLANNED DEVELOPMENTS. FOR |
| CONTACT INFORMATION PLEASE CONTACT: |
| MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR |
| 822-1515 E-MAIL: [email protected] |
| |