Plan Review Notes For Permit 18050659
Permit Number 18050659
Review Stop B
Sequence Number 1
Notes
Date Text
2018-05-17 07:32:04HAVE ALL NEEDED UTILITY RELEASES, BUT STILL NEED THE
 FOLLOWING TO ISSUE:
  
 1) A PLUMBING PERMIT PULLED TO CAP THE SEWER LATERAL.
 THEN A FINAL PLUMBING, #703 REQUESTED AND PASSED, ON
 THAT PERMIT. IT IS NOW REQUIRED THAT A PLAN FOR DUST
 CONTROL BE CLEAR AT THE START. IF A PERMANENT BACKFLOW
 INSTALLATION IS NOT PLANNED, THEN A HYDRANT METER
 RECEIPT, OR AFFIDAVIT THAT A WATER TRUCK OR ANOTHER
 MEANS OF DUST CONTROL, SHOULD BE ON SITE FOR THE
 PLUMBING INSPECTOR AT THE PLUMBING FINAL.
  
 2) HISTORIC'S PLAN REVIEW PASSED.
  
 3) ENGINEERING'S PLAN REVIEW PASSED.
  
 MOVING THE APPLICATION ON TO ENGINEERING'S MAILBOX. ANY
 QUESTIONS, FEEL FREE TO CALL TOM AT 561-805-6669.